Laserfiche WebLink
October 25, 2019 <br />Hart Crm er, Inc. <br />IC <br />BIG BOULDER CREEK BRIDGE <br />REPLACEMENT <br />Smllor <br />princlpel <br />vrtnapal <br />Senior <br />Associate <br />Seim <br />Proyd <br />Serdar5lart I <br />StnO <br />Senior <br />orartm <br />Draltm <br />pmject <br />r yte,q <br />Ilan SCOPE OF WORK <br />531919 <br />526216 <br />$218.30 $185.50 <br />$164A3 <br />§127.78 $113.56 <br />$93.40 <br />$11289 <br />$78fi.55 <br />$109,e8 <br />0 CML ENGINEERING <br />6.10 Project Wanagamenl <br />6-20 PW Bid Docs <br />Site PnMeradon Plan (gl(r1G01100 Ad} <br />Roadway plan end pronto (3 IM11001100Ad) <br />— <br />Typtcal Sections and Details (9011001100 Ad) <br />Detour plan, prune d typical se0m <br />f3QW1W100Ad)-- <br />RAI closure signEge plan <br />Clvll Stream grading forbypass arWor <br />ShAments no draviingal <br />- - - - <br />Stommeter Site plan and CSPP <br />CIA! Special Pm mom <br />-_--_-� - <br />Civil Cost Es!Imate <br />6.30 QC Reviews <br />8.40 Corla0ueAon Support <br />I_-- <br />-- - <br />6.50 Revise contract docurnerds to remove <br />nnanant bridge work <br />_-- <br />d.60 Revise cm9recl dacumer9s <br />Labor Subtotal: <br />1-Obor Sum: <br />paMWUr'aibllY Surn <br />0 <br />a <br />0 <br />at <br />0 0 <br />a p <br />0 <br />0 <br />0 0 <br />76 39 — <br />0 I <br />0 <br />0 _ <br />- 11 <br />0 <br />n <br />0 <br />41 <br />$0 <br />FbF,729 <br />i y�2� <br />l� Page 4 of 8 <br />