My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-11-12-minutes-public-works-study-session
>
Meetings
>
2019
>
11. November
>
2019-11-19 10:00 AM - Commissioners' Agenda
>
2019-11-12-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 10:47:12 AM
Creation date
5/12/2020 10:44:08 AM
Metadata
Fields
Template:
Meeting
Date
11/19/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
57953
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 25, 2019 <br />Hart C-ser, Ina <br />HC <br />BIG BOULDER CREEK BRIDGE <br />REPLACEMENT <br />senior <br />Principe) <br />Prindpal <br />senhr 5elaor <br />,Asextate Proied <br />prep <br />senlorstag <br />stare �iilor Omaer PrOI°d <br />DrdW Aadamrs <br />11 <br />Ilam I SCOPE OF WORK <br />$313.20 <br />$252.16 <br />$219.30 $1116,80 $164.83 <br />;127.10 <br />8113.58 <br />$83,40 $112.93 ;106.55 $1us.50 <br />1 PROJECT MANAGEMENT <br />1.10 Project Team Management and Coordination <br />1.20 Monthly Pfogresa Repoltallrnoicas <br />--- <br />1.30 MonNy Project Progress Mcelings/Mlnutes <br />1.40 Coordinaeonwrih WDFW <br />_-.-.-.. <br />1.60 Team CooMinatlon for design charl�le <br />1.70 Teem i,00rdinaLon for I.Iis.d &$,g" <br />---_ <br />Labor Subtelal: <br />2 STRUCTURAL ENGINEERING <br />a <br />0 <br />o p a <br />8 <br />a <br />0 0 0 0 <br />$o <br />2.10 Pro act KidmH Meetln and Site Visa <br />2.20 A!' tNe Anajreis Meme <br />-- <br />290 Development of PS&EICoM.rect Bid <br />Documents <br />- --- ---� <br />2.31 Plen and Calculaeon Preparailon- <br />Caver Sheet <br />General Notes, Quan' I -. <br />Bridge L - plan oral elevagon <br />_- <br />FoundationPlan- Layout. <br />_-- --- <br />Fooling Details <br />--- - - <br />Wlnff"ll Layoul I Details <br />TemponoylUeto r Bride <br />2.32 Strue&W Spedel PravWons <br />12.83 Coal Estimate <br />-. ..._ <br />2.34 Deliverable Pleperalidn (3n%, 75%,100% 2- <br />hr. each <br />2.40 lQuOly Control Chadrs and Revlewa <br />Technical Cdlaboretion (Survey, Civil, <br />2"� Geotedpntcal H Itm Fmfronmema[ <br />� <br />- -- - <br />2 on uppart 4uminis, e. <br />2.20 Fasaibili Revlaw far 80' span bridge <br />_"- <br />2 71 Review of temporarybridge detallsfur 1 year <br />in service <br />----' <br />i 2.� Ravlea o0nbad documents to remove <br />rmenem fond xnnk <br />Lahar SubWtab: <br />GEOTECHNICAL ENGINEERING <br />0 <br />0 <br />0 0 0 <br />0 <br />0 <br />0 a 0 0 <br />80 <br />3.10 Planningand Research <br />2 <br />2 <br />2 <br />;1,008 <br />9.20 Field Work <br />' 9.21 Site Reearr,aiaeance and U811 Locales <br />7 <br />S- <br />3.22 Fidtd Explorations <br />1 <br />7 <br />12 <br />81,732 - <br />3.29 Sam ie Review & Labors Testing <br />4 <br />1 <br />3.30 OfffM Work-- <br />3.31 Engineering Analysis ars CansWffitlons 1 <br />4 <br />16 <br />8 <br />2 <br />fer!'i7 <br />3.32 Geotechnical Repordn 1 <br />6 <br />12 <br />3 <br />4 4 <br />L7,31$ <br />3.33 Pro ed Management and Meet) <br />s <br />2 <br />3.40 Constill Sn1p rt <br />4 <br />3.60 Feea3o1111y R4wlewfar e0'$pen bridge: <br />2 <br />2 <br />1 <br />1067 <br />351 ReVIeW 01 temporary bridge details for 1 year <br />In service <br />352 RevleeGeotechnicalRscommendstlonsfor <br />BOft S n <br />{ <br />2 <br />34 <br />2 <br />- )781-'" <br />-_ $s,;tri - <br />Lebor Subtatal: <br />_ - <br />4 R"LIC ie614Eww'O - 4 <br />0 <br />- - - <br />tis <br />- - <br />a a 0 <br />70 <br />- - <br />17 88 <br />a 1 14 1 0 18 <br />- --- - <br />$29,125 <br />$0,423 <br />4.10 Data Call"Itian and ReviO,a <br />4.20 Site lnspeaken <br />AX I- <br />=2umay <br />4.40 y I <br />., .._ <br />4.50 Hydmullc Analysis <br />-- ' - - - <br />4.60 Channel Stability and Scour As smerl i <br />----- - - <br />' 4.70 WDFW and Permit Caordlnafw <br />Hydrauliclrnsatlgat lon Repot t <br />Meadinp&Administration <br />-- <br />14.100 Fe"b00y Rawl" for 60' apart bridge I <br />4.101 Review of temporary bridge detsCs for t year I <br />In service <br />- <br />Optic <br />nal <br />- <br />Lobar Subtahl: <br />5 ENVIRONMENTAL DOCUMENTATION &I <br />PERMITTINO i <br />0 <br />a <br />0 0 0 <br />0 <br />0 <br />0 0 0 0 <br />$0 <br />5.10 IProjeolManagamerd 1 <br />5.20 Agency Coordination I <br />- <br />5.30 NEPAISEPA Doc"Mantelian <br />5.40 Bidvgkal Aeees$menl <br />5.60 NHPA Section 106 Evaluation <br />' <br />5.60 JARPA Package Pmparatlon and Submlttat ' <br />5.70 Local Permits and Approvals I <br />5'80 Biology Suppurl Poring Conctrucbon <br />O L!onel <br />-"---.. <br />5.90 Permit Update -60'Bddge <br />,.,... <br />I - - Labor Subtalat:' <br />a <br />0 <br />0 0 0 <br />0 <br />4 <br />0 0 0 a <br />$0 <br />iq)ff Page 3 o` B <br />
The URL can be used to link to this page
Your browser does not support the video tag.