My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-11-12-minutes-public-works-study-session
>
Meetings
>
2019
>
11. November
>
2019-11-19 10:00 AM - Commissioners' Agenda
>
2019-11-12-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 10:47:12 AM
Creation date
5/12/2020 10:44:08 AM
Metadata
Fields
Template:
Meeting
Date
11/19/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
57953
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0daber25,2018 <br />Waheehed Science d Engineering <br />WSE <br />BiG BOULDER CREEK BRIDGE <br />REPLACEMENT <br />Senior Junior Q0^trecl <br />Prirrcfpel engt+eerl Engineer Adminr letmlo <br />ll <br />mann I SCOPE OF WORK <br />$212.98 5188.88 $97.37 $94.93 <br />1 PROJECT MANAGEMENT <br />1.10 Project Team Management and Coordnstion <br />I." MordWy Pragress Repmtslinvoices <br />1.30 Monthly Projed Progress Meslings/Minutas <br />1.40 Coordination with WDFW <br />1.60 Team Coordination for design change <br />_ <br />'.i Team Coordlnallon for revised deal n <br />Labor Subtotal: <br />0 0 8 o <br />$0 <br />2 37RUCTURAL ENGINEERING <br />2.10 Pro ed Klckcrlf Meeting and Site tAdt <br />2.20 Allemative Analysis Memo <br />230 Development of PSBEIContract Bid <br />Documents <br />- - -- -- -- <br />231 Pian and CaloWation Preparation <br />Cover Sheet <br />_ - <br />General Notes, Ouantlaes, <br />-- <br />BrIdge LaW. - plan anti sleval'mn <br />Farndellon Plan - Layout <br />Footing Details <br />Wingwall Leyotd l DeleRs <br />Temporarylpeloix add Layout 1----- <br />-- <br />232 S1ructmal Special Provisions <br />233 Coal EMIrnate <br />2.34 Deliverable Preparation (30%, 75%, 1001A 2 <br />hr. each <br />2.40 Quality Control MAcks and Review& <br />TedlNcal Calle6oretion {Survey. Civil, <br />Gm achnka; Hydraulics. Environmental <br />2 Construallon SupporL IKFrS, UU13MMIS, <br />270 Feasibility Reel" for a0' span bridge <br />271 Revlww of temporary bridge details for 1 year <br />In service <br />ents to remove <br />280 Revieacrnrbacl d,:mm <br />rmanem brad xnrk <br />-- <br />Labor Subtotal: <br />GEOTECHNICAL ENGINEERING <br />0 1 0 1 0 0 <br />$6 <br />3.70 Planning and Research <br />3.20 Field Woknn <br />9,2i Site Reooslssancs and Utility Locates <br />- --- <br />3.22 Reid 6nplarellons <br />_ <br />3.23 Sam la Review a Laboratory Testing <br />3.30 ORlce Work <br />- <br />3.31 Engineering Analysis and Canaulleaanrs <br />3.32 Geotadmical Reporiin <br />man am <br />3.33 PMent and Meelings <br />3.40 Congbucgan Support <br />9.50 Feasibiligr Review, for 60' span bridge <br />Review o<tempon" bridge details for t year <br />8.51 Fn sewlee <br />3.52 Rsvlse Geotechnical Recommandatiorw for <br />n <br />... __. ... _ <br />Labor SL&Nftl: <br />nr VrWVLM FRVIRCCRIr1G <br />0 0 a D <br />M <br />4.10 112ft Collection end Review <br />2 6 <br />$1,2tM <br />4,20 Site lnapecdon <br />e e <br />4.30 Chennel Sury <br />2 4 <br />_ _112,4u3 <br />$Bi6 <br />4.40 Hydreiagy <br />2 4 <br />$615 <br />4.50 Hydmu;lc Anatysd <br />2 1 20 <br />4.60 Channel Stability and Scour Aasas mnem <br />10 16 <br />;a,eee <br />4.70 WDFW and Permit Coordination 1 <br />12 4 <br />PRO <br />4.80 Hydredlc Investigation Report <br />20 4 to <br />!16,972 <br />4.80 Meetings B AdmiNeLraaent <br />10 3 2 <br />$2,612 <br />4.100 FsasibiiI4 Review for 60'span bridge <br />4 8 1 <br />$1,729 <br />4.101 Review of lemporery bridge detalls for 1 year <br />4.101 <br />In service <br />4 4 <br />sl.2d, <br />_ <br />Optic <br />nal <br />Labor Subtotal: <br />5 ENVIRONMENTAL DOCUMENTATION & <br />PERMITTING <br />76 5 86 8 <br />8%,195 <br />$218 <br />5.10 IPmjed Managment <br />5.20 lAgency Coordination <br />- <br />5.30 NEPAISEPA Documentation <br />5.40 B!c&cgWl Assessment <br />- .... <br />5.50 NHPA Sedan 108 Evaluation <br />5.60 JARPA Package Preparation and Submittal <br />5.70 Local Pewits and Approvals <br />-_--_-- <br />E80 Biology Support During Construction(Optionao <br />Ion <br />5.80 Penult Update - W Bridge <br />i I <br />Lobar ttubbfal: <br />0 1 0 0 e <br />W <br />Tcpff Page 5 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.