My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-11-12-minutes-public-works-study-session
>
Meetings
>
2019
>
11. November
>
2019-11-19 10:00 AM - Commissioners' Agenda
>
2019-11-12-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 10:47:12 AM
Creation date
5/12/2020 10:44:08 AM
Metadata
Fields
Template:
Meeting
Date
11/19/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
57953
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
%WNZCENTURY <br />WEST <br />ENGI NEE RING <br />3. It is assumed an electrical investigation and electrical lighting, signage, or NAVAID <br />design is not required for this project. PAPI's, VASI's, edge lights, REIL's, or any other <br />lighting or NAVAID's are not included within this project. The project is limited to <br />non -illuminated sign relocations/installations. <br />4. No surface or subsurface drainage improvements are included within the scope of <br />the project. It is assumed the existing shed section and drainage patterns will be <br />maintained within this project. <br />5. The obstruction verification efforts within this scope are limited to visual field survey <br />checks. No aerial mapping or AGIS survey analysis of airspace and obstructions will <br />be performed within this task. Additionally, if obstructions are identified during the <br />field verification, further obstruction analysis or AGIS level surveys would be <br />included in a subsequent task order. <br />6. It is assumed the County will prepare and conduct their own SEPA review. <br />Preparation of a SEPA checklist is not included in this scope of work. If deemed <br />necessary at a later time, this effort will be covered under a separate contract task <br />order. <br />7. It is assumed a County clearing and grading permit will not be required for this <br />project. If deemed necessary at a later time, this effort will be covered under a <br />separate contract task order. <br />8. Preparation of a DBE plan and DBE goals is not included within this scope of work. If <br />necessary, this work will be conducted in a separate contract task order. <br />9. The County shall send the invitation to bid to media outlets for advertisement and <br />pay advertising fees directly. <br />10. It is assumed the County will conduct the bid opening and will prepare the <br />construction contracts with the awarded contractor. The Consultant will not attend <br />the bid opening. <br />11. Bidding and construction administration support services is not included in this <br />scope of work and will be included in a future contract task order. <br />12. Pen and Ink updates to the Airport Layout Plan will be required by the FAA. Pen and <br />Ink ALP updates are not included within this scope, but will be part of a future <br />construction support task order. <br />10 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.