Laserfiche WebLink
CENTURY <br />WEST <br />E N G I N E E R I N G <br />13. The re -opening of the runway assumes visual approaches only. No approach <br />procedures are anticipated to be implemented at this time, and coordination for this <br />would be included within a future task order <br />C. PROJECT SCHEDULE <br />The general anticipated project schedule is as follows: <br />• Fall 2019 —Winter 2020 Project Design <br />• Spring 2020 Bid (pending construction funding) <br />0 Summer 2020 Construction (pending construction funding) <br />A detailed project schedule will be developed as part of Task 1 per this scope of work. <br />11 of 11 <br />