My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-11-12-minutes-public-works-study-session
>
Meetings
>
2019
>
11. November
>
2019-11-19 10:00 AM - Commissioners' Agenda
>
2019-11-12-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 10:47:12 AM
Creation date
5/12/2020 10:44:08 AM
Metadata
Fields
Template:
Meeting
Date
11/19/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
57953
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CENTURY <br />lsheWEST <br />E N G I N E E R I N G <br />8. Assess any signage updates necessary with the rehabilitation project. As necessary <br />layout and design non -illuminated signage improvements to be implemented with the <br />project. <br />9. Prepare 90% level plans for proposed improvements; 18 plan sheets are anticipated. <br />Anticipated plan sheets include: <br />Cover Sheet <br />Legend & Notes <br />Project Site & Survey Control Plan <br />Site Safety and Phasing Plan (1) <br />Site Safety and Phasing Plan (2) <br />Safety & Phasing Notes <br />Erosion and Sediment Control Plan <br />Erosion and Sediment Control Notes and Details <br />Runway 7-25 Rehabilitation Plan & Profile (1) <br />Runway 7-25 Rehabilitation Plan & Profile (2) <br />Runway 7-25 Rehabilitation Plan & Profile (3) <br />Runway 7-25 Rehabilitation Plan & Profile (4) <br />Runway 7-25 Rehabilitation Plan & Profile (5) <br />Grading Details and Typical Sections (1) <br />Grading Details and Typical Sections (2) <br />Pavement. Marking and Signage Plan (1) <br />Pavement Marking and Signage Plan (2) <br />Pavement Marking and Signage Details <br />10. Prepare 90% level draft bidding documents. Bidding documents will include <br />bidding/contract specifications, general and special provisions, technical provisions, <br />and other related sections and forms. Specifications will be developed per <br />WSDOT/APWA standards, supplemented with FAA standard specifications as <br />applicable. <br />11. Prepare 90% level quantity and construction cost estimates for the project. <br />12. Review NPDES requirements. Prepare Notice of Intent (NOI) for Airport/County <br />signature and submittal to Department of Ecology (DOE). It assumed that a Storm <br />Water Pollution Prevention Plan (SWPPP) will be prepared by the contractor to <br />receive coverage under the NPDES Construction Stormwater General Permit prior to <br />beginning construction. <br />13. Prepare four sets of 90% level plans and specifications. Two sets will be submitted <br />to the Airport and two sets will be kept for reference. <br />8of11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.