Laserfiche WebLink
FCENTURY <br />WEST <br />E N G I NEER ING <br />5.5. PROJECT MANAGEMENT, ACCOUNTING, QA/QC, AND TEAM MEETINGS <br />The advanced engineering design tasks will extend the schedule required to complete the NEPA analysis. <br />(See Section 7, Estimated Schedule Impact, for a discussion on the anticipated schedule impact). Thus, <br />additional project management and accounting will be required. Further internal coordination between <br />the Project team as well as QA/QC of each of the deliverable documents will be needed. Coordination <br />with FAA ADO as the design progresses from 25% to 60% will also be required in order to review design <br />progress. <br />6. ESTIMATED COST <br />Based on the project needs outlined in Sections 4 and 5 or this memo, the Rough Order of Magnitude <br />cost for the proposed work effort is anticipated to be between $400,000 and $500,000. <br />7. ESTIMATED SCHEDULE IMPACT <br />Work to support the NEPA analysis began in August 2018. The Final EA was anticipated to be completed <br />around January 2020 with the environmental finding anticipated in February 2020 (a total duration of 18 <br />months). <br />Assuming the process to review and approve the Advanced Engineering Design work discussed in this <br />memorandum is completed by the end of !November 2019, the anticipated completion date of the <br />environmental finding is March 2022; an extension in the NEPA analysis schedule of 25 months. <br />Approximate timelines for when the work would occur include: <br />WAdvanced Design/Permitting Project Phases <br />Timeline <br />Advanced Design Scoping & Contract <br />December 2019 — February 2020 <br />Advanced Engineering 60% Preliminary Design Alternatives <br />i February 2020 — May 2020 i <br />i <br />Field Investigations & Site Coordination (Wetland, Flood, <br />Cultural, Biological, FEMA, DOE, COE Coordination) <br />April 2020 —June 2020 <br />Advanced Engineering 60% Draft Final Design Alternatives <br />July 2020 — October 2020 <br />Identify Wetland Mitigation Areas & Alternatives <br />September 2020 —January 2021 <br />Permitting Submittal Preparation & Mitigation <br />Design/Coordination <br />!October 2020 -February 2021 ' <br />Advanced Engineering 60% Final Design Alternatives I October 2020 - February 2021 <br />I <br />j Submit Permit Applications February 2021 <br />Permitting Agency Coordination February 2021— September 2021 <br />Draft EA July 2021—September 2021 I <br />Bowers Field Airport Environmental Assessment Page 11 <br />Advanced Design Needs for NEPA Analysis November 27, 2019 <br />