My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-09-minutes-public-works-study-session
>
Meetings
>
2019
>
12. December
>
2019-12-17 10:00 AM - Commissioners' Agenda
>
2019-12-09-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 10:38:23 AM
Creation date
5/12/2020 10:36:25 AM
Metadata
Fields
Template:
Meeting
Date
12/17/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
58634
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
///VCESTTURY <br />E N G I N E E R N G <br />• Site demolition of existing airfield features <br />• Geometric layout of runway and taxiway improvements <br />• Layout of proposed electrical lighting and signage improvements <br />• Taxiway profile and site grading design <br />• Temporary erosion and sediment control <br />• Site geotechnical investigation for the purposes of pavement design <br />• Airfield pavement design <br />• Construction phasing for each individual project <br />• Layout, and sizing of airfield storm drainage improvements <br />r- 114"1 l: <br />A Draft Advanced Airfield Engineering Design Memorandum will be prepared to document the design <br />rationale that is implemented. This memorandum will be finalized following a County and FAA review <br />meeting to discuss comments on the draft memorandum. <br />While it is anticipated that the design will be advanced to a level of approximately 60%, the plans that will <br />be developed are intended to serve as an overview and documentation of the design rather than full 60% <br />bid documents. It is also expected that electrical engineering and load calculations will not be required for <br />airfield lighting and signage improvements at this time. <br />Deliverables: <br />a Draft and Final Geotechnical Report <br />• Draft and Final 60 Percent Advanced Airfield Design Plans <br />• Draft and Final Advanced Airfield Engineering Design Memorandum <br />5.2. ADVANCED FLOOD MITIGATION DESIGN <br />The design for the proposed flood mitigation improvements will be advanced. Additional alternatives <br />analysis will be performed to ensure the optimal and least impactful solution is implemented. The design <br />will include layout, sizing and grading for flood mitigation BMP's and will incorporate the calculated <br />outflows from the airfield storm drainage design into the hydrologic model. <br />Drawings depicting the layout, sizing and grading for the proposed improvements will be incorporated <br />into the Advanced Airfield Design Plan deliverable from Section 5.1 of this memo. The Floodplain <br />Assessment Report deliverable will be amended from the effort that has been performed to date. <br />Deliverables: <br />• Draft and Final Floodplain Assessment Report <br />• Draft and Final Stormwater Design Report and Improvement Plans <br />Bowers Field Airport Environmental Assessment Page 9 <br />Advanced Design Needs for NEPA Analysis <br />November 27, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.