My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-09-minutes-public-works-study-session
>
Meetings
>
2019
>
12. December
>
2019-12-17 10:00 AM - Commissioners' Agenda
>
2019-12-09-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 10:38:23 AM
Creation date
5/12/2020 10:36:25 AM
Metadata
Fields
Template:
Meeting
Date
12/17/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
58634
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
%7ZWESTTURY r FSA <br />E N G I N E E R I N G <br />The Washington Department of Ecology must issue the Section 401 Water Quality Certification in <br />advance of the Corps Section 404 Individual Permit. Public noticing and coordination with stakeholders <br />and Tribes is also required for the Individual Permit. Thus, the overall timeline for securing the required <br />permits for the proposed airfield improvements is anticipated to be between 12 and 24 months. <br />5. ADVANCED ENGINEERING DESIGN & ENVIRONMENTAL INVESTIGATION <br />NEEDED TO COMPLETE NEPA ANALYSIS <br />Advanced engineering design will advance the 25 percent design to 60 percent design for all <br />improvements except items such as electrical load calculations and pavement marking layout which are <br />not required to allow the environmental permits to be submitted. Advanced environmental investigation <br />will perform additional site analysis required for permit submittal and completion of the Draft EA. <br />All improvements will follow the requirements of Advisory Circular (AC) 150/5300-13A, Airport Design; AC <br />150/5370-10 Standards for Specifying Construction of Airports; AC 150/5370-2G Operations Safety on <br />Airports during Construction; and other current advisory circulars as required. All deliverables required in <br />this section shall be submitted to Kittitas County and FAA ADO for review in the form of one compiled <br />draft and one compiled final submittal. <br />5.1. ADVANCED ENGINEERING DESIGN TAXIWAY AND RUNWAY <br />This task will include advancing the preliminary engineering (25% design) to an approximately 60% level <br />for the following work elements: <br />Bowers Field Airport Environmental Assessment Page S <br />Advanced Design Needs for NEPA Analysis November 27, 2019 <br />13 <br />J <br />bo <br />to <br />G <br />N <br />ip <br />c <br />o c <br />o� <br />o <br />Permit <br />o <br />°' <br />> Cr <br />'0 rr <br />(issuing Agency) <br />Submittal Requirements <br />U 3 <br />U <br />° <br />Q <br />Yes; Within <br />Wetland rating forms and figures <br />Direct Study <br />25% <br />60% <br />Yes <br />Area Only <br />Yes; Within <br />I <br />Off-site Mitigation Plan Drawings <br />Direct Study <br />25% <br />i 60% <br />Yes <br />Area Only <br />Floodplain Signed application form and fee <br />Yes <br />25% <br />25% <br />No <br />Development Project Description <br />Yes <br />25% <br />25% <br />No <br />Permit <br />(Kittitas County) Estimated Project Cost <br />Yes <br />25% <br />60% <br />Yes <br />Yes <br />25% <br />60% <br />Yes <br />Site Grading Plan & Fill Quantities <br />No Net Loss & Mitigation Analysis <br />Yes <br />25% <br />60% <br />Yes <br />The Washington Department of Ecology must issue the Section 401 Water Quality Certification in <br />advance of the Corps Section 404 Individual Permit. Public noticing and coordination with stakeholders <br />and Tribes is also required for the Individual Permit. Thus, the overall timeline for securing the required <br />permits for the proposed airfield improvements is anticipated to be between 12 and 24 months. <br />5. ADVANCED ENGINEERING DESIGN & ENVIRONMENTAL INVESTIGATION <br />NEEDED TO COMPLETE NEPA ANALYSIS <br />Advanced engineering design will advance the 25 percent design to 60 percent design for all <br />improvements except items such as electrical load calculations and pavement marking layout which are <br />not required to allow the environmental permits to be submitted. Advanced environmental investigation <br />will perform additional site analysis required for permit submittal and completion of the Draft EA. <br />All improvements will follow the requirements of Advisory Circular (AC) 150/5300-13A, Airport Design; AC <br />150/5370-10 Standards for Specifying Construction of Airports; AC 150/5370-2G Operations Safety on <br />Airports during Construction; and other current advisory circulars as required. All deliverables required in <br />this section shall be submitted to Kittitas County and FAA ADO for review in the form of one compiled <br />draft and one compiled final submittal. <br />5.1. ADVANCED ENGINEERING DESIGN TAXIWAY AND RUNWAY <br />This task will include advancing the preliminary engineering (25% design) to an approximately 60% level <br />for the following work elements: <br />Bowers Field Airport Environmental Assessment Page S <br />Advanced Design Needs for NEPA Analysis November 27, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.