Laserfiche WebLink
d.Will any structures be demolished?If so,what?[helol <br />No. <br />e.What is the current zoning classification of the site?[helol <br />Master Planned Resort. <br />f.What is the current comprehensive plan designation of the site? [help1 <br />Resort Residential. <br />g.If applicable, what is the current shoreline master programdesignation of the site? [helol <br />Not applicable. <br />h.Has any part of the site been classified as a critical area by the city or county?If so,specify.[helol <br />Wetlands 27, 35, and 39 are adjacent to Phase 3 Divisions 15&16 and were identified as environrnentally sensitive. <br />i.Approximately how many people would reside or work in the completed project?[helo1 <br />210 to 420 people. <br />j.Approximatelyhow many peoplewould the completed projectdisplace?thelol <br />None. <br />k.Proposed measures to avoid or reducedisplacement impacts,if any: thelol <br />Not applicable. <br />L.Proposed measures to ensure the proposal is compatible with existing and projected land <br />uses and plans,if any:thelo1 <br />Please see Section B.8.I of attachment. <br />m.Proposed measures to reduce or control impacts to agricultural and forest lands of long-term <br />commercial significance,if any:[helpl <br />Not applicable. <br />9.Housing Ihelol <br />a.Approximatelyhow many units would be provided,if any?Indicate whether high, mid- <br />die,or low-incomehousing.thelo1 <br />105 detached residential lots and open space.The residences will be high-income housing. <br />SEPA Environmental checklist (WAC 197-11-960)July 2016 Page 8 of 13 <br />Index #8