My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-19-00002 Suncadia Ph. 3 Div. 15 & 16 Index Master File
>
Meetings
>
2019
>
09. September
>
2019-09-03 2:00 PM - 2:00pm Public Hearing
>
LP-19-00002 Suncadia Ph. 3 Div. 15 & 16 Index Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2019 12:09:06 PM
Creation date
8/29/2019 12:02:08 PM
Metadata
Fields
Template:
Meeting
Date
9/3/2019
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider the Suncadia Phase 3 Divisions 15 & 16 Preliminary Plat.
Order
1
Placement
2:00pm Public Hearing
Row ID
56118
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
design.This includes undergroundhazardous liquid and gas transmission pipelines located <br />within the project area and in the vicinity.thelol <br />The site is currently undeveloped and there are no known existing hazardous chemicals/conditions. <br />3)Describe any toxic or hazardous chemicals that might be stored,used,or producedduring the <br />project's development or construction,or at any time during the operating life of the project. <br />ihelp1 <br />None known. <br />4)Describe special emergency services that might be required.[helol <br />Please see Section B.7.a(1) of attachment. <br />5)Proposed measures to reduce or control environmental health hazards,if any:thelo1 <br />Please see Section B.7.a(2)of attachment. <br />b.Noise [helol <br />1)What types of noise exist in the area which may affect your project (for example: <br />traffic,equipment,operation,other)?[help1 <br />No known sources of noise exist that would affect the proposal. <br />2)What types and levels of noise would be created by or associated with the project on a <br />short-term or a long-term basis (for example: traffic, construction, operation, other)?Indi- <br />cate what hours noise would come from the site.Thelo1 <br />Please see Section B.7.b(2)of attachment. <br />3)Proposed measures to reduce or control noise impacts,if any: [helol <br />Please see Section B.7.b(3)of attachment. <br />8.Land andShoreline Use lhelo1 <br />a.What is the current use of the site and adjacentproperties?Will the proposalaffect current land uses <br />on nearby or adjacent properties?If so,describe.thelo1 <br />Please see Section B.8.a of attachment. <br />b.Has the project site been used as workingfarmlands or working forest lands?If so,describe.How <br />much agricultural or forest land of long-term commercial significance will be converted to other uses as <br />a result of the proposal,if any?If resource lands have not been designated,how many acres in <br />farmland or forest land tax status will be converted to nonfarm or nonforest use?[helol <br />No forest lands of commercial significance will be converted as a result of this proposal. <br />1)Will the proposal affect or be affected by surroundingworking farm or forest land normal business <br />operations,such as oversize equipment access,the application of pesticides,tilling, and <br />harvesting?If so,how: thelo1 <br />No. <br />c.Describe any structures on the site.thelo1 <br />None. <br />SEPA Environmental checklist (WAC 197-11-960)July 2016 Page 7 of 13 <br />Index #8
The URL can be used to link to this page
Your browser does not support the video tag.