My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-19-00002 Suncadia Ph. 3 Div. 15 & 16 Index Master File
>
Meetings
>
2019
>
09. September
>
2019-09-03 2:00 PM - 2:00pm Public Hearing
>
LP-19-00002 Suncadia Ph. 3 Div. 15 & 16 Index Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2019 12:09:06 PM
Creation date
8/29/2019 12:02:08 PM
Metadata
Fields
Template:
Meeting
Date
9/3/2019
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider the Suncadia Phase 3 Divisions 15 & 16 Preliminary Plat.
Order
1
Placement
2:00pm Public Hearing
Row ID
56118
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b.Approximatelyhow many units,if any,would be eliminated?Indicatewhether high, <br />middle,or low-income housing. [helpl <br />None. <br />c.Proposed measures to reduce or control housing impacts,if any:thelol <br />Please see Section B.9.c of attachment. <br />10.Aesthetics thelD1 <br />a.What is the tallest height of any proposed structure(s),not including antennas;what is <br />the principal exterior buildingmaterial(s)proposed?[helol <br />Please see Section B.10.a of attachment. <br />b.What views in the immediatevicinity would be altered or obstructed?[helol <br />Please see Section B.10.b of attachment. <br />c.Proposed measures to reduce or control aesthetic impacts,if any:thelol <br />Please see Section B.10.c of attachment. <br />11.Light ancl Glare [helol <br />a.What type of light or glare will the proposalproduce?What time of day would it mainly <br />occur?lhelol <br />Please see Section B.11.a of attachment. <br />b.Could light or glare from the finished project be a safety hazard or interfere with views?[helD1 <br />Light and glare are not expected to be a safety factor or interfere with existing views. <br />c.What existing off-site sources of light or glare may affect your proposal?[helol <br />None known. <br />d.Proposedmeasures to reduce or control light and glare impacts,if any:thelo1 <br />Please see Section B.11.d of attachment. <br />12.Recreation [helo1 <br />a.What designated and informal recreationalopportunities are in the immediate vicinity?[helol <br />Please see Section B.12.a of attachment. <br />b.Would the proposed project displace any existing recreational uses?If so,describe.thelo1 <br />The proposed project will not displace existing recreationalopportunities in the project area. <br />c.Proposed measures to reduce or control impacts on recreation,including recreation opportunities to be <br />provided by the project or applicant,if any: thelol <br />Measures outlined in the MPR Conditions of Approval Sections C-27 through C-29 will be adhered to. <br />SEPA Environmental checklist (WAC 197-11-960)July 2016 Page 9 of 13 <br />Index #8
The URL can be used to link to this page
Your browser does not support the video tag.