My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-19-00002 Suncadia Ph. 3 Div. 15 & 16 Index Master File
>
Meetings
>
2019
>
09. September
>
2019-09-03 2:00 PM - 2:00pm Public Hearing
>
LP-19-00002 Suncadia Ph. 3 Div. 15 & 16 Index Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2019 12:09:06 PM
Creation date
8/29/2019 12:02:08 PM
Metadata
Fields
Template:
Meeting
Date
9/3/2019
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider the Suncadia Phase 3 Divisions 15 & 16 Preliminary Plat.
Order
1
Placement
2:00pm Public Hearing
Row ID
56118
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a.Ust any birds and other animals which have been observed on or near the site or are known to be on <br />or near the site.fhelol <br />Examples include: <br />birds:hawk, heron,eagle,songbirds, other: <br />mammals: deer,bear, elk,beaver,other: <br />fish:bass, salmon,trout,herring, shellfish,other <br />Songbirds, deer,bear, and elk. <br />b.List any threatened and endangered species known to be on or near the site. [helol <br />Please see Section B.5.b of attachment. <br />c. Is the site part of a migration route?If so,explain.thelD1 <br />Yes,Elk are known to cross portions of the project site as they move west during the winter. <br />d.Proposed measures to preserve or enhance wildlife,if any: [helol <br />Please see Section B.5.d of attachment. <br />e.List any invasiveanimal species known to be on or near the site.thelol <br />None known. <br />6.Energy and NaturalResources [helol <br />a.What kinds of energy (electric,natural gas, oil,wood stove,solar)will be used to meet <br />the completed project's energy needs?Describewhether it will be used for heating, <br />manufacturing,etc. thelol <br />Energy needs are described in Section 4.14 of the DEIS.Natural gas will be used for heating and cooking. <br />b.Would your project affect the potential use of solar energy by adjacent properties? <br />If so,generally describe.[helD1 <br />The project is not anticipated to affect any potential use of solar energy by adjacent properties. <br />c.What kinds of energy conservation features are included in the plans of this proposal? <br />List other proposedmeasures to reduce or control energy impacts,if any: [helol <br />Construction will be in compliance with the IBC and Washington State Energy Code. <br />7.EnvironmentalHealth [helo1 <br />a.Are there any environmental health hazards,including exposure to toxic chemicals,risk <br />of fire and explosion,spill,or hazardous waste,that could occur as a result of this proposal? <br />If so,describe.fhelol <br />Please see Section B.7.a of attachment. <br />1)Describe any known or possible contamination at the site from present or past uses.[helol <br />None known. <br />2)Describe existing hazardouschemicals/conditions that might affect project developmentand <br />SEPA Environmental checklist (WAC 197-11-960)July 2016 Page 6 of 13 <br />Index #8
The URL can be used to link to this page
Your browser does not support the video tag.