My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-2037 Comp Plan Update Enabling Ordinance with Exhibit A
>
Meetings
>
2019
>
06. June
>
2019-06-18 10:00 AM - Commissioners' Agenda
>
2017-2037 Comp Plan Update Enabling Ordinance with Exhibit A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2019 1:20:58 PM
Creation date
6/13/2019 1:12:11 PM
Metadata
Fields
Template:
Meeting
Date
6/18/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
h
Item
Request to Approve an Ordinance Adopting the 2017-2037 Comprehensive Plan Periodic Update and Associated Maps
Order
8
Placement
Consent Agenda
Row ID
54424
Type
Ordinance
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Filed for Record 04/16/2009 04:48:53 PM - Kittitas County, WA Auditor - 200904160090 Page 85 of 118 <br />C-3 Sianal at Bullfrog Entrance. (Intentionally deleted) <br />C-4 Bullfrog/SR 903 Intersection. (Intentionally deleted) <br />C-5 Baseline Traffic. Volumes and Initial Annual Background Growth Rate Assumption. The <br />applicant shall conduct traffic volume monitoring on August 25 through September 4, 2000, to <br />determine a baseline traffic volume for purposes of calculating proportionate share. Once this <br />baseline traffic volume data has been collected, it shall be compared to the traffic volume data <br />from the MPR-FEIS, collected in 1997, to determine an the Initial Annual Background Growth <br />Rate Assumption, which will be used in calculating proportionate shares for all traffic impact <br />mitigation assessed on site development plans and/or preliminary plat applications filed within 5 <br />years of the date of this MPR approval, the "Effective Date," as defined in the Development <br />Agreement. The Initial Annual Background Growth Rate Assumption ("IBG") shall be <br />calculated as follows: <br />RBG = TV'00 _ 1 X100% <br />TI ;9e7 <br />RBG = initial background growth rate <br />RBG,,, = revised background growth rate after year 5 <br />TVA total volume in year x <br />R 1� —background volume in year x, defined as TV —MPR V, <br />MPRV, = master planned resort volume in year x <br />If the resulting Initial Annual Background Growth Rate Assumption is substantially different <br />than that identified in the MPR-FEIS, then additional evaluation of an appropriate Initial Annual <br />Background Growth Rate Assumption shall be completed by the County for determining <br />proportionate shares. <br />C -5A Revised Annual Background Growth Rate Assumption. After the first five years of traffic <br />impact mitigation proportionate share calculations based on the Initial Annual Background <br />Growth Rate Assumption determined in Condition C-5, the annual background growth rate <br />assumption shall be revised based on information provided in the monitoring reports required <br />pursuant to Condition C-17. This revised rate shall be calculated for each intersection or road <br />segment monitored based on the change in background traffic at that location over the previous 5 <br />years. The Revised Annual Background Growth Rate ("ABG") shall be recalculated as follows: <br />RB%� __ 1 5 B]�VrTx-i _ 1 X100% <br />llre 5� UI x <br />Suncadia MPR Conditions of Approval Page 17 <br />December 2, 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.