My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-2037 Comp Plan Update Enabling Ordinance with Exhibit A
>
Meetings
>
2019
>
06. June
>
2019-06-18 10:00 AM - Commissioners' Agenda
>
2017-2037 Comp Plan Update Enabling Ordinance with Exhibit A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2019 1:20:58 PM
Creation date
6/13/2019 1:12:11 PM
Metadata
Fields
Template:
Meeting
Date
6/18/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
h
Item
Request to Approve an Ordinance Adopting the 2017-2037 Comprehensive Plan Periodic Update and Associated Maps
Order
8
Placement
Consent Agenda
Row ID
54424
Type
Ordinance
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Filed for Record 04/16/2009 04:48:53 PM - Kittitas County, WA Auditor - 200904160090 Page 86 of 118 <br />This Revised Annual Background Growth Rate Assumption shall then be applied to determine <br />the County's share of any off-site traffic mitigation required as conditions of approval of any site <br />development plan and/or preliminary plat application filed after the first five-year period. <br />C-6 Proportionate Share. The applicant shall be responsible for its proportionate share of any <br />off-site traffic improvements described in Condition C-9, including any additional mitigation <br />measures for off-site improvements identified through the monitoring program described in <br />Condition C-17. Proportionate Share shall be calculated as follows: <br />a. First, the Projected Added Traffic Volume for the intersection or road segment shall be <br />calculated by subtracting the baseline traffic volume determined by the traffic counts <br />required by Condition C-5 from the total amount of traffic that is projected to be using <br />the road segment or intersection when the proposed phase or sub phase of the resort <br />development has been constructed and occupied. This projection must include both any <br />Background Growth projected as well as any traffic projections from the proposed phase <br />or sub phase of development based on the method of traffic projection in the EIS as may <br />be modified based on the results of monitoring. Summer weekend PM peak hour (Friday <br />afternoon through Sunday evening) shall be the time period used for measuring and <br />projecting traffic volumes. <br />b. Second, the Added Traffic Volumes shall be divided into an MPR share and a County <br />share. The County's (or public) share shall be the Annual Background Growth Rate <br />Assumption described in Conditions C-5 and C -5A, multiplied by the number of years <br />between the date of this MPR approval (the "Effective Date", as defined in the <br />Development Agreement) and the year in which the particular traffic improvement is <br />projected to be necessary to maintain the required level of service described in Condition <br />C-14. That Annual Background Growth Rate Assumption shall be determined as <br />described in Conditions C-5 and C -5A. The applicant's share shall be the difference <br />between the County share and the Total Added Traffic Volume. <br />c. Third, these resulting percentages for the County and the Applicant shall then be applied <br />to the total cost of the necessary improvements, including all costs to plan, design, <br />review, permit, obtain funding, inspect and construct the improvement. All identified <br />off-site traffic improvements for which there is identified a public share shall be <br />incorporated, whenever possible, into the County's Six -Year Transportation <br />Improvement Program to prioritize improvements generally consistent with projected <br />growth and proposed development of the MPR and to make use of available public <br />funding sources. The MPR proportionate share shall be calculated as follows (see also <br />Table A for illustrative purposes only): <br />MPR,,,a- — (MPR <br />V — MPR V <br />x x-' x 100% <br />TV,, — TV,_, <br />if TV, — TVx_, 5 0, then MPR,,,,,,, =100% <br />C-7 Concurrency. If the existing and projected traffic from a particular phase or subphase of <br />development being reviewed for site development plan or preliminary plat approval will cause <br />the level of service on affected intersections or road segments to fall below the accepted level of <br />Suncadia MPR Conditions of Approval Page 18 <br />December 2, 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.