My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage to Pomona FEIS Index 34
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
Vantage to Pomona FEIS Index 34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:49:29 PM
Creation date
12/13/2018 1:34:21 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Conduct a Closed Record Meeting to consider the Hearing Examiner's Recommendation for the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
50108
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
980
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage to Pomona Heights Chapter 4 <br />230 kV Transmission Line Project FEIS Environmental Consequences <br /> PAGE 4-256 <br />widening access roads; preparing and using pulling and tensioning sites, staging areas, and other <br />temporary use areas; geotechnical drilling; and implementing restoration and re-vegetation measures. <br />Ground disturbance could disturb archaeological sites and TCPs. Architectural resources could also be <br />subject to physical disturbance, but no buildings and structures have been identified in areas of potential <br />ground disturbance for the proposed Project. <br />For construction of overhead transmission line route segments, direct visual impacts could result when <br />single-pole and H-frame structures are installed near visually sensitive TCPs and architectural resources <br />that have retained their integrity of setting. <br />New and improved access along proposed Project route segments may lead to increased vandalism at <br />archaeological sites, architectural resources, and TCPs unless access is otherwise restricted, such as at the <br />Joint Base Lewis-McChord Yakima Training Center (JBLM YTC). <br />For construction of underground transmission line route segments, direct physical impacts could result <br />from ground disturbing activities associated with trenching; grading or widening access roads; staging <br />areas and other temporary use areas; geotechnical drilling; and implementing restoration and re- <br />vegetation measures. Ground disturbance could disturb archaeological sites and TCPs. Architectural <br />resources could also be subject to physical disturbance, but no buildings and structures have been <br />identified in areas of potential ground disturbance for the proposed Project. <br />For construction of underground transmission line route segments, direct visual impacts could result in <br />areas that have been cleared of vegetation, changing the setting of visually sensitive cultural resources <br />nearby. <br />For this analysis, it is assumed that cultural resources within 75 feet of the centerline of a route segment <br />would potentially be subject to both physical and visual impacts. It is assumed that cultural resources <br />more than 75 feet from the centerline could potentially be subject to visual impacts and indirect physical <br />impacts (i.e., vandalism), but not direct physical impacts. Overall, the amount of ground disturbance <br />would likely be much greater for an underground transmission line route segment than for an overhead <br />transmission line route segment. However, the likelihood of there being changes in visual setting would <br />be less for an underground transmission line route segment, in which clearance of vegetation would be the <br />most visible evidence, than for an overhead transmission line route segment, in which there would be <br />cleared right-of-way (ROW) corridor, tall structures, and conductors visible from nearby cultural <br />resources. <br />4.11.2 Impact Levels (High, Moderate, Low, No Identifiable Impact) <br />The impact levels for the cultural resource impact assessment are defined as follows: <br />High - A high level of impact to cultural resources would result if the construction, operation, or <br />maintenance of the proposed Project has the potential to cause a substantial ground disturbance or adverse <br />visual change to known cultural resources that are listed in or eligible for the National Register, to cultural <br />resources that have not been evaluated for National Register eligibility, and on land with a high potential <br />for containing cultural resources that has not been surveyed for cultural resources. <br />Moderate - A moderate impact to cultural resources would result if the construction, operation, or <br />maintenance of the proposed Project would cause ground disturbance or visual changes on land with a <br />moderate potential for containing cultural resources that has not been surveyed for cultural resources.
The URL can be used to link to this page
Your browser does not support the video tag.