My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage to Pomona FEIS Index 34
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
Vantage to Pomona FEIS Index 34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:49:29 PM
Creation date
12/13/2018 1:34:21 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Conduct a Closed Record Meeting to consider the Hearing Examiner's Recommendation for the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
50108
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
980
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage to Pomona Heights Chapter 4 <br />230 kV Transmission Line Project FEIS Environmental Consequences <br />PAGE 4-233 <br />Table 4.9-5 Current and Project Labor Income by Action Alternatives <br />ACTION ALTERNATIVE LABOR INCOME WAGE AND BENEFIT PAYMENTS INCOME MULTIPLIER <br />Alternatives A-H $5,500,000 $4,000,000 1.38 <br />NNR Alternative* $3,936,943 $2,881,302 1.37 <br />NNR Alternative - MR Subroute $4,478,322 $3,300,667 1.36 <br />*Agency Preferred Alternative <br />Only very minor differences among Alternatives A-H would occur because wages paid and purchases of <br />local goods and services vary by extremely small amounts. <br />Population and Housing <br />Only three or four of the on-site construction jobs would be filled by workers from the Study Region <br />labor supply. The remainder, plus the average of five visiting personnel, would be filled by in-migrating <br />or visiting workers who would not bring dependents and who would choose transient housing. It is also <br />likely that the firms directly supplying goods and services for construction (aggregate, business services, <br />etc., shown in Table 4.9-2) would recognize the sales to the Project as temporary and either increase the <br />hours of existing employees or make temporary hires that would be unlikely to be filled by in-migrants. <br />The remaining jobs created by Project construction may not be recognized by firms as temporary due to <br />construction and some in-migration could occur in response to this increase in employment, but would be <br />limited by the presence of substantial numbers of unemployed local persons who would be more likely to <br />take these jobs. A high estimate is that 15 to 20 jobs created by the Project could be filled by in-migrants <br />or by local persons who otherwise would leave the Study Region. This estimate includes the three or four <br />jobs expected to be filled by local hires and the 8 to 12 jobs created by induced and indirect effects shown <br />in Table 4.9-4. As the Study Region employment base increases over time, these persons could remain as <br />permanent residents even after the temporary demand increase due to Project construction is done. <br />Average household size in the Study Region was 2.74 in 2010 (Table 3.9-3, Section 3.9.2.3). If in- <br />migrants bring with them households of this size, the population impact of the Project would be 43 to 58 <br />persons. This estimate may be high as persons who migrate for employment opportunities generally have <br />smaller household sizes than the general population. This represents an unnoticeable increase in the 2013 <br />Study Region population of 386,970 (0.01 percent). <br />The supply of rental housing in the Study Region is somewhat tight and is expected to remain so, as the <br />housing construction sector nationally is expected to continue to recover very slowly. However, with <br />4,149 vacant units for sale or for rent in 2010, of which 2,686 were for rent (Table 3.9-3, Section 3.9.2.3), <br />the local rental and ownership housing supply can readily accommodate an increase in demand of an <br />estimated 15 to 20 units. <br />Itinerant workers at the site would add to the temporary population of the Study Region, particularly in <br />nearby communities that have available transient housing. These persons would number an average of <br />approximately 45 persons: 40 in-migrating construction workers on-site, plus about five visitors; during <br />the peak period of construction, transient workers would number about 50 persons. Some of the itinerant <br />construction workers would travel via RVs, increasing demand for RV spaces, with the remainder seeking <br />hotel rooms and a few renting temporary housing. <br />As described in Section 3.9.2.3, RV and hotel spaces close to the Action Alternatives are likely to be <br />available in Yakima, Ellensburg, and Vantage. If demand for RV and hotel units originates in one <br />location along the route (such as if construction proceeds from one end to the other), the demand increase <br />due to the Project could strain the nearby supplies and workers may have to find hotel or RV spots at
The URL can be used to link to this page
Your browser does not support the video tag.