My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage to Pomona FEIS Index 34
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
Vantage to Pomona FEIS Index 34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:49:29 PM
Creation date
12/13/2018 1:34:21 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Conduct a Closed Record Meeting to consider the Hearing Examiner's Recommendation for the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
50108
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
980
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage to Pomona Heights Chapter 4 <br />230 kV Transmission Line Project FEIS Environmental Consequences <br />PAGE 4-231 <br />These factors would limit both population increases and demands for long-term rental and owner housing. <br />Increased demand for transient housing (hotels and RV spaces) could be noticeable compared to limited <br />availability in the local area. <br />4.9.5.4 Government Revenue <br />Local taxes paid due to construction and operation of the facilities will consist of sales and use taxes for <br />materials used in construction, ad valorem property taxes on the value of the facilities, and the <br />Washington Public Utility Tax. In addition, lease payments for rights-of-way (ROWs) on public lands <br />would be made, including to the U.S. Bureau of Land Management (BLM), the military for use of Joint <br />Base Lewis-McChord Yakima Training Center (JBLM YTC) lands, U.S. Bureau of Reclamation <br />(Reclamation), and Washington State Department of Transportation (WSDOT). <br />4.9.6 Impact Results and Summary by Alternative <br />To consolidate the presentation of data tables, Alternatives A-H, the NNR Alternative with Design <br />Options and MR Subroute, and the No Action Alternative are presented for each segment of <br />socioeconomics. A summary of the impacts of each Alternative is presented in Section 4.9.4.2. <br />4.9.6.1 No Action Alternative <br />Under the No Action Alternative, the proposed Project would not be constructed or operated. No impacts <br />on socioeconomics would occur. <br />4.9.6.1 Impacts of Action Alternatives <br />Employment <br />Impacts on employment would be generally very small under any Action Alternative. The impacts of 23.7 <br />to 41.0 direct jobs would transfer, including all ripple effects, to a total of 58.9 to 66.3 jobs for the NNR <br />Alternative and NNR Alternative - MR Subroute, respectively, and a total of 88 jobs for Alternatives A-H <br />based on the IMPLAN analysis. This indicates a relatively high employment multiplier of approximately <br />2.2. These impacts are displayed in Table 4.9-4. This would be minimal in the context of total <br />employment in the Study Region of about 170,000 persons. Only very minor differences among <br />Alternatives A-H would exist because employment is estimated to vary by so little (40.6 to 41.4 jobs on <br />average for one year). The IMPLAN analysis results are displayed in Table 4.9-4. <br />It is notable that the ripple effects and impact multipliers on employment are relatively high. This is <br />because the relatively high union wages paid to construction workers and accompanying high local <br />spending would create a substantial impact per worker as their expenditures recycle in the Study Region <br />economy. Also, much of the impact would be from spending by itinerant workers in restaurants, hotels, <br />and food stores which pay much lower wages than construction. Thus, a fairly large number of jobs <br />would be supported by a fairly low number of on-site workers. <br />The impacts described in Table 4.9-4 are totals for the overall Study Region. Some differences in impacts <br />among Counties would exist due to the Columbia River which acts to constrict movement between <br />Yakima, Kittitas, and Grant counties. Action Alternatives not involving Grant County (Alternatives B, C, <br />E, and G) would likely result in the bulk of the total Study Region impacts occurring in Yakima and <br />Kittitas counties. The Action Alternatives involving locations in Grant County (Alternatives A, D, F, and <br />H) would likely create greater impacts in Grant County, since nearly half of construction activities and, <br />thus, demand for housing, food, and miscellaneous retail goods would take place in Grant County. Under <br />the NNR Alternative and NNR Alternative - MR Subroute, most of the construction taking place in <br />Kittitas County and with workers most likely living for the longest time in the Ellensburg area, Kittitas <br />County would likely experience the most beneficial impacts.
The URL can be used to link to this page
Your browser does not support the video tag.