Vantage to Pomona Heights Chapter 4 <br />230 kV Transmission Line Project FEIS Environmental Consequences <br /> PAGE 4-207 <br />Sensitive Viewer Impacts <br />Residences would view strong-moderate and moderate Project contrasts in the immediate foreground <br />along the Wahluke slope agricultural area, typically causing high impacts (MP 5.6-6.0, 10.0-10.6, and <br />12.6-13.5). Some views of the route segment would be seen in the context of the existing Midway- <br />Vantage/Shultz-Wautoma transmission line corridor in the middleground, and impacts would be low. <br />Immediate foreground views would also occur northeast of Beverly (MP 22.4-22.9 and 23.3-24.0) <br />causing high impacts. <br />Immediate foreground and foreground views of strong contrasts would also occur from recreationists <br />using the Columbia River corridor, causing high impacts. Motorists using SR-243 would also view the <br />route segment for a short duration as it parallels and crosses the highway at MP 3.9. Impacts of the line on <br />these viewers would be moderate to low to the north of the highway because the route segment would be <br />viewed in the context of the Priest Rapids-Midway transmission line corridor. High impacts would occur <br />south of the highway because the route segment, including the steel lattice river crossing structures, <br />would be viewed against the Columbia River and Umtanum Ridge basalt cliffs (see Appendix C-4, KOP <br />5). <br />The route segment crosses the Milwaukee Road Corridor (see Appendix C-3: KOP 9) at MP 21.3-21.4 <br />causing high impacts. The route segment would also be in the middleground of recreationists using the <br />Burkett Lake Recreation Area (see Appendix C-3: KOP 8), causing high impacts. The route segment <br />would also be in the middleground view of the Saddle Mountains Hang Gliding Launch Area, where the <br />route segment would be seen in the valley over 1,800 feet below causing moderate impacts. <br />The route segment would also parallel and cross 24 SW Road west of Mattawa, causing high impacts for <br />0.9 mile (MP 11.1-12.0) and cross Lower Crab Creek Road at MP 21.1-21.2 causing high impacts. <br />Moderate impacts would occur where the route segment crosses Beverly-Burke Road as it parallels the <br />Hanford-Vantage No. 1 corridor. <br />Moderate impacts would occur for a short distance where the route segment would be viewed from the <br />Saddle Mountains Recreation Destination Route (R Road Extension), but typically would be low. Views <br />from this road are typically from the inferior position and the route segment would be seen in the context <br />of the existing Hanford-Vantage No. 1 500 kV corridor. On the north end of this road, views are more <br />sensitive as it enters the high elevations of the Saddle Mountains Management Area. Impacts would be <br />high for a short distance where the route segment is skylined and also crosses the road. Contrasts as seen <br />from KOP 7, however, would generally be moderate because of the context of the existing transmission <br />line and distribution infrastructure as seen from this vantage point (see Appendix C-4, KOP 7). <br />Agency Management Compliance <br />BLM Interim VRM Class III lands are crossed between MP 14.3 and MP 16.2, and MP 17.0-19.6. Project <br />contrasts would be strong and strong-moderate for 1.4 miles of the 4.5 mile Interim VRM Class III <br />crossing (MP 14.3-14.5, 16.0-16.1, 17.7-17.9, and 18.7-19.6). As seen from KOP 7, the route segment <br />would be in compliance with the Interim VRM Class III designation because strong to strong-moderate <br />contrasts are seen in the immediate foreground to background distance zone would be mitigated (see <br />below) and because the route segment would be seen in the context of the existing Hanford-Vantage No. <br />1 500 kV transmission line and distribution transmission facilities servicing the communication <br />infrastructure located on the Saddle Mountains. <br />The route segment would also comply with the visual standards identified in the Grant County <br />Comprehensive Plan, Grant County Public Utility District (PUD) 2010 Final Shoreline Management Plan <br />and Benton County Comprehensive Land Use Plan.