Vantage to Pomona FEIS Index 34
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
Vantage to Pomona FEIS Index 34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:49:29 PM
Creation date
12/13/2018 1:34:21 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Conduct a Closed Record Meeting to consider the Hearing Examiner's Recommendation for the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
50108
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
980
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage to Pomona Heights Chapter 4 <br />230 kV Transmission Line Project FEIS Environmental Consequences <br /> PAGE 4-208 <br />4.8.5.11 Route Segment NNR-2 <br />Visual Contrasts <br />On the south end along this route segment, strong structure contrasts would be created as a result of the <br />introduction of H-frame structures where no currently exist except in the area where the route segment <br />crosses the Ellensburg-Moxee No.1 115 kV transmission line. The Ellensburg-Moxee No. 1 115 kV <br />transmission line and the route segment also follows the JBLM YTC fire break road in this area. The fire <br />break would be utilized for the route segment; therefore, weak landscape contrasts would result. Overall, <br />strong Project contrasts would be created on the south end of the route segment. As the Ellensburg-Moxee <br />No. 1 115 kV transmission line turns to the west near the water tower on JBLM YTC, the route segment <br />would parallel this existing transmission line to the south end of the JBLM YTC Parade Field. <br />Ellensburg-Moxee No. 1 has a similar H-frame configuration and scale. Weak structure contrasts would <br />result along this portion of the route segment. <br />From the south end of the Parade Field to Firing Center Road, the route segment would utilize single pole <br />structures. Along Firing Center Road, single pole structures with distribution underbuild would be <br />constructed. These sections would result in strong-moderate or moderate-weak structure contrasts <br />(Configuration #3, Table 4.8-3). Because the route segment would follow Firing Center Road, no new <br />roads would be constructed and landscape contrasts would not occur. Landscape contrast would be strong <br />where existing vegetation would be removed adjacent to the Parade Field, resulting in moderate Project <br />contrast along this portion of the route segment (MP 2.4 - 2.7). Along Firing Center Road, Project <br />contrasts would typically be moderate, as shown in shown in Appendix C-4: KOP 15. <br />Pulling and tensioning sites would also cause short-term landscape and structure contrasts. The presence <br />of a helicopter during the stringing of the conductor wires would cause short-term structure contrasts. The <br />temporary structure work areas, turn-around areas, and staging areas would cause low impacts due to the <br />duration of landscape and structure contrasts. <br />Scenic Quality Impacts and Development Character <br />Impacts on scenic quality and development character created by Route Segment NNR-2 primarily relate <br />to the compatibility with the non-military residential and JBLM YTC residential and industrial character <br />area and scenery impacts on the undeveloped JBLM YTC areas crossed by the route segment. The <br />existing Pomona-Wanapum 230 kV transmission line visually influences the residential and undeveloped <br />scenic character causing low to moderate impacts on the southern and northern portions of this existing <br />transmission line that is less developed. The route segment would generally be in character with most of <br />the JBLM YTC cantonment area because the route segment would parallel existing transmission lines or <br />would be in intensive use areas of the military training center (Appendix C-4: KOP 15 and Appendix C- <br />3). <br />Sensitive Viewer Impacts <br />Visual impacts on sensitive viewers would result from strong-moderate to moderate contrasts being seen <br />from residences and travelers in the immediate foreground distance zone from Sage Trail Road, Temple <br />Lane area, Shotgun Lane, and E. Pomona Road area, primarily. The route segment would generally be <br />seen in the context of the JBLM YTC military facilities (e.g., Vagabond Army Heliport, lodging areas, <br />administrative structures, Armed Forces Reserve Center), the existing Ellensburg-Moxee No. 1 115 kV <br />transmission line, and other urban development in the cantonment area. However, topographical <br />screening often block views of much of the cantonment area and a row of trees that soften views to the <br />cantonment area would be removed from on the south of Firing Center Road along Shotgun Lane, <br />increasing impacts in this area. The implementation of RDF VR-7, span matching with existing structures <br />would reduce the impacts of the route segment in this location. Residences along Sage Trail Road would