My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage to Pomona FEIS Index 34
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
Vantage to Pomona FEIS Index 34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:49:29 PM
Creation date
12/13/2018 1:34:21 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Conduct a Closed Record Meeting to consider the Hearing Examiner's Recommendation for the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
50108
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
980
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage to Pomona Heights Chapter 4 <br />230 kV Transmission Line Project FEIS Environmental Consequences <br /> PAGE 4-206 <br />Moderate and high sensitivity recreationists using the Columbia River corridor below Priest Rapids Dam, <br />Priest Rapids Reservoir recreationists and John Wayne Pioneer Trail users would also view moderate to <br />strong Project contrasts in the immediate foreground causing moderate to high visual impacts. The route <br />segment would be viewed longitudinally as it follows the John Wayne Trail and would dominate the <br />viewshed. The route segment would affect views from the John Wayne Trail Trailhead (see Appendix C- <br />3: KOP 12), dominating scenic views of the Columbia River corridor to the south. <br />Motorists and recreationists using Huntzinger Road would also view the route segment in the immediate <br />foreground along the road for about five miles (approximately MP 13.6-18.7), causing high or moderate <br />impacts. <br />Agency Management Compliance <br />BLM Interim VRM Class III lands are crossed between MP 19.1 and MP 19.6. Project contrasts would be <br />strong for a short distance (MP 19.1-19.3). The route segment would be in compliance with Interim VRM <br />Class III from KOP 12 (John Wayne Pioneer Trail) because moderate-weak contrasts are seen in the <br />immediate foreground to background distance zone and because the route segment would be seen in the <br />middleground distance zone set against the existing Pomona-Wanapum 230 kV/Wanapum-Wind Ridge <br />230 kV/Schultz-Vantage 500 kV/Schultz Wautoma 500 kV transmission line corridor. <br />The route segment would also comply with the visual standards identified in the Yakima County <br />Comprehensive Plan and all applicable development regulations, the Kittitas County Comprehensive <br />Plan, and the Benton County Comprehensive Land Use Plan. <br />4.8.5.10 Route Segment 3c <br />Visual Contrasts <br />Structure contrast would typically be strong along this route segment. Where the route segment crosses <br />the Midway-Vantage 230 kV/Shultz-Wautoma 500 kV corridor and parallels the Hanford-Vantage No. 1 <br />500 kV corridor, structure contrasts would be moderate (see Table 4.8-2, Structure Configuration #8). <br />Much of this route segment follows existing roads and portions of agricultural areas; therefore, landscape <br />contrasts would be weak or none. Moderate and strong landscape contrasts occur in the Saddle Mountains <br />Management Area and other areas where no roads occur, typically where the route segment does not <br />follow existing transmission lines. Helicopter placement of transmission line structures between MP 20.0 <br />and 20.6 would reduce landscape contrasts by eliminating the need for road construction and associated <br />clearing and grading activities. Structure contrasts would be strongest where at the Columbia River <br />crossing, 195-foot tall steel lattice structures would be constructed on the north and south sides of the <br />river. The visual influence of the crossing structures would extend further than the typical single pole or <br />H-frame Project wood structures, with immediate foreground views occurring within 0.75 mile of the <br />structures (see distance zone discussion, Section 3.8.2.5). <br />Scenic Quality Impacts and Development Character <br />Scenic quality impacts along this route segment would be moderate to high in Class B landscapes along <br />the Columbia River and high in Class A landscapes of the Saddle Mountains and Crab Creek area. The <br />route segment would impact the scenic quality of the landscape by contrasting with the dominating river <br />and lake shorelines, rocky talus slope toes and basalt cliffs of the Columbia River, and the rocky outcrops, <br />erosional plumes, and rock formations of the Saddle Mountains. The route segment would traverse <br />Agricultural Development Character Areas of the Wahluke Slope and would not be compatible in this <br />landscape. The route segment would cross mixed Agricultural/Residential Development Character Areas <br />and also would not be compatible with this existing character.
The URL can be used to link to this page
Your browser does not support the video tag.