Vantage to Pomona FEIS Index 34
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
Vantage to Pomona FEIS Index 34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:49:29 PM
Creation date
12/13/2018 1:34:21 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Conduct a Closed Record Meeting to consider the Hearing Examiner's Recommendation for the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
50108
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
980
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage to Pomona Heights Chapter 4 <br />230 kV Transmission Line Project FEIS Environmental Consequences <br /> PAGE 4-199 <br />4.8.5 Impacts Specific to Route Segments and Design Options <br />4.8.5.1 Route Segment 1a/NNR-1 <br />Visual Contrasts <br />Along this route segment, visual contrasts are primarily dependent on the extent to which the proposed <br />Project would parallel existing transmission lines, incorporate existing distribution lines, or would <br />introduce a new structure in the landscape where no infrastructure currently exists. Pacific Power’s <br />existing Pomona-Wanapum Transmission Line is paralleled between milepost (MP) 0.0 and 0.7 (see <br />configuration #7 in Table 4.8-3). No existing transmission or distribution structures exist between MP 0.7 <br />and 0.8 and between MP 1.9 and 2.4 (see configuration #2 in Table 4.8-3 and KOP 1 in Appendix C-4). <br />The existing distribution line would be rebuilt along Sage Trail Road (see Appendix A - Visual Resources <br />map), creating strong/moderate structure contrasts (see configuration #3 in Table 4.8-3) between MP 0.8 <br />and 2.0. Landscape contrast would be none to weak because existing roads along the Pomona-Wanapum <br />transmission line and Sage Trail Road would typically be used and vegetation cover is not often present <br />due to development or is low-growing, herbaceous ground cover. Where Vegetation Group 3 removal is <br />necessary as a result of spur road construction, greater landscape and Project contrast would result. <br />Pulling and tensioning sites would also cause short-term landscape and structure contrasts. The presence <br />of a helicopter during the stringing of the conductor wire would cause short-term structure contrasts, <br />potentially disrupting views or scenic vistas (e.g., toward the Cascade Mountains). The temporary <br />structure work areas, turn-around areas, and staging areas would cause low impacts due to the duration of <br />landscape and structure contrasts. Project contrast would typically be weak near the Pomona Heights <br />Substation and where the line would parallel Pacific Power’s existing Pomona-Wanapum 230 kV <br />transmission line, but otherwise moderate to strong. <br />Scenic Quality Impacts and Development Character <br />The landscape of Route Segment 1a/NNR-1 is developed in character, with low density residential visual <br />architectural elements dominating scenery. The natural scenery is visually subordinate within the <br />landscape, typically only influencing middleground and background views (e.g., Yakima Ridge, Mount <br />Rainier). This residential character is affected along the route segment by the presence of the Pomona- <br />Wanapum 230 kV transmission line crossing the area, which contributes industrial visual elements in an <br />otherwise predominantly residential setting. However, because of the industrial nature of the proposed <br />Project and visual separation of the existing line from the route segment, the Project’s form, line, color, <br />and texture would not be compatible with the predominant residential architectural features and would <br />create high impacts on the developed landscape in areas where the route segment deviates from <br />paralleling the existing Pomona-Wanapum 230 kV Transmission line. <br />Sensitive Viewer Impacts <br />Several residences located along Sage Trail Road and adjacent roads would have new transmission line <br />structures and conductors in the line of sight of Mount Rainier and the route segment structures may <br />impede views, depending on final placement. This would occur on the middle and eastern section of the <br />route segment where it would intersect with Sage Trail Road and generally parallel it. Therefore, the new <br />pole structures would create high impacts on residential viewers along this portion of the route segment. <br />Impacts are the result of generally strong to strong/moderate structure contrasts seen in the immediate <br />foreground. Structures could potentially obstruct views of Mount Rainier (at various locations along the <br />route segment) and would affect views across the Selah Valley to the northwest. Mitigation Measure VR- <br />1 (see Table 4.8-2) would reduce impacts created as a result of view obstruction. Also, new conductors <br />would be reflective for several years after installation, producing diffused reflection (glare) that would <br />contrast with the daytime sky or landscape backdrop. KOP 1, located on the east of Sage Trail Road (see <br />Appendix A - Project Maps-Visual Resources), illustrates views along Sage Trail Road where 3-pole