My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage to Pomona FEIS Index 34
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
Vantage to Pomona FEIS Index 34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:49:29 PM
Creation date
12/13/2018 1:34:21 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Conduct a Closed Record Meeting to consider the Hearing Examiner's Recommendation for the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
50108
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
980
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage to Pomona Heights Chapter 4 <br />230 kV Transmission Line Project FEIS Environmental Consequences <br /> PAGE 4-200 <br />angle-guyed structures and single wood poles are proposed. A visual simulation of the Project from this <br />KOP is shown in Appendix C-4 - KOP 1. <br />Views of the route segment from residences located in the County Squires Mobile Manor are generally <br />screened by vegetation, but some would view the route segment against the Yakima Ridge. From this <br />location, the Pomona-Wanapum 230 kV transmission line is also within the foreground viewshed and low <br />impacts on these residences are anticipated. <br />Viewers using East Selah Road would have very brief views of the route segment in the immediate <br />foreground. Views from both travelling directions are generally screened by buildings, vegetation, and <br />topography. Route Segment 1a/NNR-1 would be seen in the visual context of the existing Pomona- <br />Wanapum 230 kV transmission line, Pomona Heights Substation, and existing transmission lines located <br />along East Selah Road. Impacts would be low on these viewers, also. <br />Agency Management Compliance <br />There are no federal or state lands crossed by this route segment. The route segment would comply with <br />the visual standards identified in the Yakima County Comprehensive Plan. <br />4.8.5.2 Route Segment 1b <br />Visual Contrasts <br />Structure contrast would be strong along this entire route segment; no existing transmission line <br />infrastructure or other substantial development, other than adjacent residential development, is located <br />within this corridor. Route Segment 1b would generally follow the southern boundary of the Joint Base <br />Lewis-McChord Yakima Training Center (JBLM YTC) on federal land, and would utilize the existing <br />fire break road following the property line. Because access for the route segment would be “Level 2” (use <br />existing roads), typically, along most of the route segment and because the existing vegetation is Group 2 <br />or 3 (shrubs and/or grassland), landscape contrast would be weak. Short portions of this route segment <br />would deviate from the fire break road, and new access may be required (see MP 9.6-10.9) in an area of <br />Group 3 or 4 vegetation (sagebrush/rabbitbrush/overstory trees), causing strong landscape contrasts. The <br />strongest visual contrasts would occur in these areas where new road and structure installation would <br />occur in steeper areas of Group 2 or 3 vegetation. Typically, Project contrasts would be strong-moderate, <br />with some isolated areas of strong or moderate where vegetation, slope and road construction variables <br />reduce or increase overall visual contrast. <br />Scenic Quality Impacts and Development Character <br />Scenic quality impacts would be moderate to low in the Class C Yakima Ridge landscape setting along <br />this route segment. The route segment would be compatible with the existing development character <br />where it crosses in the vicinity of the Ellensburg-Moxee #1 115 kV transmission line corridor (MP 0.2- <br />0.3). However, the vertical H-frame structures and linear features of the conductors (wires) would <br />contrast with the simple rolling, undulating, and horizontally flowing lines of the landforms of Yakima <br />Ridge. Moderate scenic quality impacts would occur along a portion of Route Segment 1b, but would <br />otherwise be low. No high scenic quality impacts are expected as a result of Route Segment 1b. <br />Sensitive Viewer Impacts <br />Residences would be affected by the construction and operation of the route segment, because the H- <br />frame structures and conductor wires would be seen in the immediate foreground and foreground of <br />residences located on Sage Trail Road, Summerset Drive, and Bohoskey Drive (MP 0.0-0.2 and 5.8-6.2). <br />Strong contrast would be seen in the middleground from residences located north of Mieras Road and <br />along St. Hilaire Road (see KOP 2, Appendix C-3) where the route segment would be skylined (MP 6.5- <br />6.7) causing moderate residual impacts at this distance. Strong to strong-moderate Project contrasts would
The URL can be used to link to this page
Your browser does not support the video tag.