My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage to Pomona FEIS Index 34
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
Vantage to Pomona FEIS Index 34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:49:29 PM
Creation date
12/13/2018 1:34:21 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Conduct a Closed Record Meeting to consider the Hearing Examiner's Recommendation for the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
50108
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
980
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage to Pomona Heights Chapter 4 <br />230 kV Transmission Line Project FEIS Environmental Consequences <br /> PAGE 4-197 <br />High – High visual impacts would result from strong, strong-moderate or moderate contrasts in Class A <br />scenic quality landscapes and strong contrasts in Class B landscapes (Table 4.8-5). High impacts would <br />also occur as a result of strong-moderate Project contrasts being seen in the immediate foreground or <br />foreground of high sensitivity viewers and in the immediate foreground of moderate sensitivity viewers. <br />High impacts would also result from moderate contrasts being seen in the middleground by high <br />sensitivity viewers (Tables 4.8-6 and 4.8-7). <br />Moderate – Moderate visual impacts would result from moderate-weak or weak contrasts in Class A <br />scenic quality landscapes, from strong-moderate or moderate contrasts in Class B landscapes, and from <br />strong or strong-moderate contrasts in Class C landscapes (Table 4.8-5). Moderate impacts would also <br />occur as a result of strong contrasts being seen in the background of high sensitivity viewers or in the <br />middleground or background of moderate sensitivity viewers (Tables 4.8-6 and 4.8-7). <br />Low – Low visual impacts would result from moderate weak or weak contrasts in Class B scenic quality <br />landscapes or moderate, moderate-weak, or weak contrasts in Class C landscapes (Table 4.8-5). Low <br />impacts would result from weak contrasts being viewed in the foreground of high sensitivity viewers or in <br />the immediate foreground of moderate sensitivity viewers (Tables 4.8-6 and 4.8-7). <br />Table 4.8-5 Scenic Quality Impacts <br />SCENIC QUALITY PROJECT CONTRAST <br />Strong Strong/Moderate Moderate Moderate/Weak Weak <br />A H H H M M <br />B H M M L L <br />C M M L L L <br />H = High Impacts; H/M = High/Moderate Impacts; M = Moderate Impacts; M/L = Moderate/Low Impacts; L = Low Impacts. <br /> <br />Table 4.8-6 Highly Sensitive View Impacts <br />DISTANCE ZONE <br />PROJECT CONTRAST <br />Strong Strong / Moderate Moderate Moderate / Weak Weak <br />Immediate Foreground <br />0 to 500 feet-Underground Design Option <br />0 to 1,000 feet- Pole/H-frame <br />0 to 0.75 mi-Crossing Lattice Steel Tower <br />H H H M M <br />Foreground <br />500 feet to 2,000 feet- Underground Design Option <br />1,000 feet to 0.33 mi- Pole/H-frame <br />0.75 mi to 1.5 mi-Crossing Lattice Steel Tower <br />H H M M L <br />Middleground <br />2,000 feet to 0.75 mi - Underground Design Option <br />0.33 mi to 1 mi- Pole/H-frame <br />1.5 mi to 3 mi -Crossing Lattice Steel Tower <br />H M M L L <br />Background <br />0.75 mi to 1.25 mi - Underground Design Option <br />1 to 2 mi- Pole/H-frame <br />3 mi to 4 mi-Crossing Lattice Steel Tower <br />M M L L L <br />Seldom Seen <br />Beyond 1.25 mi - Underground Design Option <br />Beyond 2 mi - Pole/H-frame <br />Beyond 4 mi -Crossing Lattice Steel Tower <br />L L L L L <br />H = High Impacts; H/M = High/Moderate Impacts; M = Moderate Impacts; M/L = Moderate/Low Impacts; L = Low Impacts; mi = miles.
The URL can be used to link to this page
Your browser does not support the video tag.