Vantage to Pomona Heights Chapter 2
<br />230 kV Transmission Line Project FEIS Proposed Action and Alternatives
<br /> PAGE 2-85
<br />Table 2-7 Access Road Disturbance By Route Segment
<br />
<br />ROUTE SEGMENT
<br />SHORT-TERM DISTURBANCE LONG-TERM DISTURBANCE
<br />TOTAL SHORT-TERM ACCESS DISTURBANCE TOTAL LONG-TERM ACCESS DISTURBANCE Overland Access 14’ wide by length, (Access Level 1)
<br />Improve Existing Roads and Construct New Spur Roads (Access Levels 2 or 3)
<br />Blade New, 14’ wide x length (Access Levels 4, 5, 6, or 7)
<br />Square Feet Acres Square Feet Acres Square Feet Acres Square Feet Acres Square Feet Acres
<br />1a/NNR-1 0 0.00 70,560 1.62 0 0.00 0 0.00 70,560 1.62
<br />1b 0 0.00 332,220 7.63 97,574 2.24 0 0.00 429,794 9.9
<br />1c 0 0.00 611,167 14.03 650,866 14.94 2,218 0.05 936,046 21.5
<br />2a 2,218 0.05 40,572 0.93 73,181 1.68 0 0.00 87,881 2.0
<br />2b 0 0.00 371,028 8.52 1,355,323 31.11 2,957 0.07 1,493,503 34.3
<br />2c 2,957 0.07 504,974 11.59 586,925 13.47 8,131 0.19 957,365 22.0
<br />2d 8,131 0.19 274,361 6.30 510,418 11.72 0 0.00 619,198 14.2
<br />3a 0 0.00 5,880 0.13 0 0.00 0 0.00 5,880 0.1
<br />3b 0 0.00 1,329,938 30.53 703,718 16.16 0 0.00 1,329,938 30.5
<br />3c 2,957 0.07 847,190 19.45 451,651 10.37 2,957 0.07 1,086,691 24.9
<br />NNR-2 0 0.00 152,880 3.51 0 0.00 0 0.00 152,880 3.51
<br />NNR-3 739 0.02 670,438 15.39 20,328 0.47 739 0.02 690,766 15.86
<br />NNR-4o 739 0.02 204,742 4.70 0 0.47 739 0.02 204,742 4.70
<br />NNR-4u 739 0.02 204,742 4.70 0 0.00 739 0.02 204,742 4.70
<br />NNR-5 0 0.00 49,980 1.15 9,240 0.21 0 0.00 59,220 1.36
<br />NNR-6o 0 0.00 232,495 5.34 0 0.00 0 0.00 232,495 5.34
<br />NNR-6u 0 0.00 232,495 5.34 0 0.00 0 0.00 232,495 5.34
<br />NNR-7 0 0.00 244,020 5.60 0 0.00 0 0.00 244,020 5.60
<br />NNR-8 0 0.00 83,143 1.91 0 0.00 0 0.00 83,143 1.91
<br />MR-1 739 0.02 382,082 8.77 998,290 22.92 739 0.02 1,380,372 31.69
|