My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage to Pomona FEIS Index 34
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
Vantage to Pomona FEIS Index 34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:49:29 PM
Creation date
12/13/2018 1:34:21 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Conduct a Closed Record Meeting to consider the Hearing Examiner's Recommendation for the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
50108
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
980
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage to Pomona Heights Chapter 2 <br />230 kV Transmission Line Project FEIS Proposed Action and Alternatives <br /> PAGE 2-84 <br />Cost estimates were also developed for all Action Alternatives. The cost for underground segments <br />assumes 10 to 15 times cost of overhead ($427,634 per mile for overhead; 10.9 miles – Route Segments <br />NNR-4u & NNR-6u). The estimated construction cost for each Action Alternative is as follows: <br />• NNR Alternative – Overhead Design Option (FEIS Agency Preferred Alternative) - $17.3 <br />million <br />• NNR Alternative – Underground Design Option - $59.2 to 82.5 million <br />• NNR Alternative – MR Subroute - $19.8 million <br />• Alternative A - $28.6 million <br />• Alternative B - $30.8 million <br />• Alternative C – $31.0 million <br />• Alternative D – $28.9 million <br />• Alternative E – $30.9 million <br />• Alternative F – $28.6 million <br />• Alternative G – $31.3 million <br />• Alternative H – $28.9 million
The URL can be used to link to this page
Your browser does not support the video tag.