My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2018-160 Task Order 16
>
Meetings
>
2018
>
10. October
>
2018-10-02 10:00 AM - Commissioners' Agenda
>
Res-2018-160 Task Order 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2018 12:00:01 PM
Creation date
10/5/2018 11:59:40 AM
Metadata
Fields
Template:
Meeting
Date
10/2/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
p
Item
Request to Approve a Resolution Authorizing Chair's Signature on KPFF Task Order No.16 for the Big Boulder Creek Bridge Replacement
Order
16
Placement
Consent Agenda
Row ID
48177
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />compliance assurance, file and staff organization, client communications ( emails and telephone), <br />and general project oversight. Project Management tasks include: <br />1.1 Project Team Management and Coordination <br />1.2 Monthly Progress Reports/Invoices (Assume 8) <br />1.3 Monthly Project Progress Meetings/Minutes (Assume 8 meetings, held via <br />teleconference) <br />1.4 Coordination with WDFW (Assume 8 hours) <br />1.5 Management Reserve -allocation of the reserve funds for additional out of scope <br />tasks based on written approval of the County <br />TASK2 STRUCTURAL ENGINEERING <br />KPFF shall perform the structural engineering analysis and design of the Big Boulder Creek <br />Bridge substructure. KPFF shall perform appropriate analysis and design calculations in <br />accordance with the most current edition (at the time ofNTP) of the WSDOT Bridge Design <br />Manual (BDM) and the AASHTO LRFD Bridge Design Specifications, and the Local Agency <br />Guidelines. Considering the location and use of the bridge, alternative criteria, such as Forest <br />Service guidelines, may be considered to reduce construction costs. <br />TASK 2.1 -Project Kickoff Meeting and Site Visit <br />A project kickoff meeting will be held at the existing bridge site . <br />TASK 2.2 -Alternative Analysis Memo <br />Brief memo to summarize site constraints, design criteria and preferred bridge structure <br />TASK 2.3 -Development of PS&E/Contract Bid Documents <br />TASK 2.31 -Plan and Calculation Preparation <br />• Project Cover Sheet <br />• General Notes and Quantities <br />• Bridge Layout -plan and elevation <br />• Structural notes <br />• Foundation Plan-Layout <br />• Foundation Design and Details <br />• Wingwall Layout/Details <br />TASK 2.32 -Structural Special Provisions
The URL can be used to link to this page
Your browser does not support the video tag.