My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2018-160 Task Order 16
>
Meetings
>
2018
>
10. October
>
2018-10-02 10:00 AM - Commissioners' Agenda
>
Res-2018-160 Task Order 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2018 12:00:01 PM
Creation date
10/5/2018 11:59:40 AM
Metadata
Fields
Template:
Meeting
Date
10/2/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
p
Item
Request to Approve a Resolution Authorizing Chair's Signature on KPFF Task Order No.16 for the Big Boulder Creek Bridge Replacement
Order
16
Placement
Consent Agenda
Row ID
48177
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />Formal Task Order Document <br />KPFF <br />Task Order Number 016 <br />Maximum Amount Payable $173,000 Completion Date 12/30/2019 <br />The general provisions and clauses of Local Agency Agreement Number (KCPW 2017- <br />19ENG2) shall be in full force and effect for this Task Order. <br />Location of Project: Kittitas County <br />Project Title: Big Boulder Creek Bridge Replacement <br />Description of Work: KPFF will prepare the PS&E documents for the replacement of the Big <br />Boulder Creek Bridge in coordination with Kittitas County staff. The design team includes: <br />KPFF -Project Management and Structural Engineering <br />Hart Crowser -Geotechnical Engineering <br />Watershed Science and Engineering -Hydraulic Engineering <br />Jacobs -Environmental/Permitting <br />Tentative Project Advertisement is April 2019, but will be dependent on permitting, fish <br />windows, and bridge procurement schedules. <br />The existing timber bridge is located on Cle Elum Valley Road over Big Boulder Creek <br />approximately three miles north of the Salmon La Sac Campground. The bridge is currently <br />posted for a 5 Ton weight limit due to scour at the timber sill foundation. The County prefers to <br />replace the bridge with a single lane prefabricated superstructure. <br />TASKl PROJECT MANAGEMENT <br />KPFF will manage the development of the PLANS, SPECS & ENGINEERING COST <br />ESTIMATE (PS&E) in such a manner to ensure the County is able to achieve the desirable <br />bidding date. This effort will include appropriate in-house duties such as invoicing, contract
The URL can be used to link to this page
Your browser does not support the video tag.