Laserfiche WebLink
BOWERS FIELD -AIRPORT MASTER PlAN <br />planned and programmed for the Airport. This analysis will provide the basis for the evaluation of <br />airport development alternatives in Element 6. The facilities requirements analysis focuses on the <br />actual physical facilities and associated improvements needed to safely and efficiently accommodate the <br />projected aviation demand on these aviation facilities for twenty years . Projected facility requirements <br />will be prioritized based on the updated master plan forecasts. Gross facility needs will be correlated <br />with a specific volume of activity or change in the level of service that will require the recommended <br />improvement. <br />In the event that there is a change In the future ARC for the airport, the conformance of existing <br />landside facilities with future standards will be evaluated . <br />Landslde facility evaluations will include existing Items documented in the inventory chapter and any <br />additional items that are identified through the master planning evaluation : <br />A. Aircraft parking needs -light aircraft tiedowns, business class aircraft parking, helicopter <br />parking areas for Itinerant and locally based aircraft; <br />B. Aircraft hangar needs -T-hangars, conventional hangars, executive hangars; <br />C. Corporate and aviation-related industrial hangars; <br />D. FBO facilities (hangar, terminal, corporate aviation services, fuel storage, fuel truck <br />parking, etc.); <br />E. Storm drainage requirements; <br />F. Bulk fuel storage facilities (location, capacity, security); <br />G. Aircraft wash facilities; <br />H. Automobile parking for tenants and visitors; <br />I. Local/regional roadway network connection points and identify potential upgrades <br />(signals, turn lanes, etc.); <br />J. Internal airport access roads and emergency access routes; <br />K. Perimeter fencing and access controls (fencing type and configuration; location of access <br />points, emergency access, etc.); <br />L. Airport security overview (facilities and procedures); <br />M. Airport maintenance equipment and materials storage; <br />N. Utility needs to service existing/new landside facilities, fire protection; <br />O. Non-Aeronautical and Non-Aviation land Inventory and demand assessment; and <br />P. Aeronautical land use requirements . <br />Page 120