My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2018-122 PSA CenturyWest
>
Meetings
>
2018
>
08. August
>
2018-08-07 10:00 AM - Commissioners' Agenda
>
Res-2018-122 PSA CenturyWest
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2018 10:03:19 AM
Creation date
8/15/2018 10:01:24 AM
Metadata
Fields
Template:
Meeting
Date
8/7/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
v
Item
Request to Approve a Resolution to Authorize the Board of County Commissioners Signature on a Professional Services Agreement with Century West for Bowers Field Environmental Services
Order
22
Placement
Consent Agenda
Row ID
47023
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Element 2 -Alternatives <br />2.1 Action (Preferred Alternative) <br />2.2 No Action Alternative <br />2.3 Alternatives Considered But Eliminated from Detailed Study <br />2.4 Discretionary Actions and Permits <br />Element 3 -Affected Environment and Environmental Consequences <br />3.1 Air Quality <br />3.2 Biotic Resources <br />3.3 Coastal Barriers <br />3.4 Coastal Zone Management <br />3.5 Compatible Land Use <br />3.6 Construction <br />3.7 Section 4(f) <br />3.8 Federally Listed Endangered and Threatened Species <br />3.9 Energy Supplies, Natural Resources , and Sustainable Design <br />3.10 Environmental Justice <br />3.11 Farmlands <br />3.12 Floodplains <br />3.13 Greenhouse Gas (GHG) Emissions/Climate <br />3.14 Hazardous Materials <br />3.15 Historical and Archaeological Resources <br />3.16 Induced Socioeconomic <br />3.17 Light Emissions and Visual Effects <br />3.18 Noise <br />3.19 Social Impacts <br />3.20 Solid Waste <br />3.21 Traffic and Circulation <br />3.22 Water Quality <br />3.23 Wetlands <br />3.24 Wild and Scenic Rivers <br />Element 4 -Cumulative Impacts <br />4.1 Summary of Cumulative Impacts <br />Element 5 -Irretrievable Commitments of Resources and Irreversible and Unavoidable Impacts <br />5.1 Summary of irretrievable commitment of resource, irreversible and unavoidable <br />impacts. <br />Figures <br />Figure 1. Vicinity <br />Figure 2. Existing Airport Facilities <br />Figure 3. Proposed Development <br />Figure 4. Preliminary Grading and Drainage Plan for Proposed Improvements <br />Bowers Field Airport Improvements EA <br />April 27, 2018 <br />20
The URL can be used to link to this page
Your browser does not support the video tag.