My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2018-122 PSA CenturyWest
>
Meetings
>
2018
>
08. August
>
2018-08-07 10:00 AM - Commissioners' Agenda
>
Res-2018-122 PSA CenturyWest
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2018 10:03:19 AM
Creation date
8/15/2018 10:01:24 AM
Metadata
Fields
Template:
Meeting
Date
8/7/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
v
Item
Request to Approve a Resolution to Authorize the Board of County Commissioners Signature on a Professional Services Agreement with Century West for Bowers Field Environmental Services
Order
22
Placement
Consent Agenda
Row ID
47023
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Add itional/Unexpected Permitting Requirements <br />If, through agency contacts, it is found that additional permits are needed or if additional <br />investigations are necessary to prepare such permits (e.g., a Section 404 Individual Permit), such <br />additional activities are considered beyond the scope of this work and will be negotiated and <br />authorized under a separate agreement or as an amendment to this scope or work. <br />Task 3.10 -FAA Status Briefing <br />Objective: The purpose of this task will be to present the preliminary findings resulting from agency <br />contacts to the County and FAA. <br />Approach: The Consultant will provide the County and FAA with a briefing of the results from the <br />preceding tasks to determine if FAA would require additional investigations, analysis, research, or <br />documentation. The briefing will be conducted via a telephone conference call. <br />Product: The Consultant will provide a summary of preliminary findings to the County and FAA for <br />review, prior to the status briefing. The Consultant will prepare meeting minutes summarizing the <br />briefing with FAA. <br />Deliverables: <br />• Minutes from the FAA Status Briefing <br />TASK 4 -ENVIRONMENTAL ASSESSMENT <br />Task 4.1 -Prepare Preliminary Draft EA <br />Objective: Prepare a Preliminary Draft EA for review by the County and FAA. The County and FAA will <br />provide comments on the Preliminary Draft EA, and the Draft EA will then be prepared to reflect the <br />County and FAA comments on the Preliminary Draft EA. <br />Approach: The Consultant will prepare a Preliminary Draft EA for FAA. The EA will be prepared <br />according to outline specified in FAA Order 5050.4B, The Airpo rt Environmental Handbook and <br />1050.lF. This standard format consists of the following items: <br />• Cover Sheet <br />• Purpose and Need <br />• Proposed Action <br />• Alternatives (including the 'No Action' Alternative) <br />• Affected Environment <br />• This section will include location and vicinity mapping and a copy of the Airport Layout <br />Plan. <br />• Environmental Consequences: <br />Bowers Field Airport Improvements EA <br />April 27, 2018 <br />13
The URL can be used to link to this page
Your browser does not support the video tag.