My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2018-122 PSA CenturyWest
>
Meetings
>
2018
>
08. August
>
2018-08-07 10:00 AM - Commissioners' Agenda
>
Res-2018-122 PSA CenturyWest
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2018 10:03:19 AM
Creation date
8/15/2018 10:01:24 AM
Metadata
Fields
Template:
Meeting
Date
8/7/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
v
Item
Request to Approve a Resolution to Authorize the Board of County Commissioners Signature on a Professional Services Agreement with Century West for Bowers Field Environmental Services
Order
22
Placement
Consent Agenda
Row ID
47023
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Based on previous site investigations, conducted during the Airport Master Plan project, no <br />significant biotic resources are anticipated. As such, this scope does not include a Biological <br />Assessment. <br />Products: The Consultant will gather this information along with any information received from <br />correspondence in Task 3.1 and provide a summary memorandum to the FAA and the County for <br />submission to the WDFW and USFWS. <br />Task 3.4 -Wetland Delineation and Functional Assessment <br />Objective: Complete a Wetlands Delineation within the Direct Study Area . <br />Approach: Consultant will complete wetland delineation and prepare a Wetland Delineation Report <br />that details the current condition and extent of wetlands in the direct study area; flagged wetland <br />boundaries will be surveyed as discussed in Task 2.4. Consultant will prepare a report suitable for <br />submittal to the US Army Corps of Engineers (Corps) for permitting under Section 404 of the Clean <br />Water Act and to the County for permitting under its critical area ordinance. The report will include <br />information on the topography, vegetation, soils, and hydrology of each wetland in the project area <br />and will include data sheets documenting upland and wetland areas. Consultant will survey the <br />wetland boundaries in the field and a map showing wetland boundaries will be included in the <br />delineation report. <br />Products: A draft report of the Wetlands Delineation report will be provided for review by the FAA <br />and the County for review and comment. Upon revision, review comments will be addressed in the <br />final report. <br />Task 3.5 -Floodplain Assessment <br />Objective: Complete a hydraulic engineering analysis to assess potential for the proposed projects to <br />impact floodplains associated with the nearby Whiskey and Mercer Creek, and determine flood <br />reduction alternatives. <br />Approach: Consultant will complete a floodplain assessment and prepare a report that details the <br />current conditions, the potential for the proposed projects to impact floodplains and create flooding, <br />and recommended impact reduction alternatives. Hydraulic modeling will be performed as part of the <br />assessment. Previously collected data and information will be utilized to the greatest extent possible <br />while performing the assessment and formulating the report. The report will document assessment <br />study methods, assumptions, analyses and results and be consistent with Kittitas County Code, <br />including Chapter 14.08, Flood Damage Prevention. The results of the report will be used to formulate <br />design alternatives, the 'preferred alternative', and potential for impacts to floodplains and obtaining <br />a floodplain development permit, if needed (See Task 3.9). The alternatives analysis will consider <br />flood alleviation for the on-site projects; as well as any in-direct on-site or off-site flood alleviation <br />improvements (as necessary) to mitigate worsening of flood impacts to in-direct areas. <br />Should other floodplain related activities be necessary, Consultant will prepare a separate scope and <br />fee to assist as needed. This additional work will be conducted under a separate agreement or as an <br />amendment to this scope of work. <br />Bowers Field Airport Improvements EA <br />April 27, 2018 <br />10
The URL can be used to link to this page
Your browser does not support the video tag.