My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutiontoAuthorizeProfessionalServicesAgmtforEAatBowersField
>
Meetings
>
2018
>
08. August
>
2018-08-07 10:00 AM - Commissioners' Agenda
>
ResolutiontoAuthorizeProfessionalServicesAgmtforEAatBowersField
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2018 12:47:39 PM
Creation date
8/2/2018 12:44:41 PM
Metadata
Fields
Template:
Meeting
Date
8/7/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
v
Item
Request to Approve a Resolution to Authorize the Board of County Commissioners Signature on a Professional Services Agreement with Century West for Bowers Field Environmental Services
Order
22
Placement
Consent Agenda
Row ID
47023
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
related nature of drainage off-site to the north of the Airport boundary; indirect additional drainage <br />improvements (on-site and/or off-site) may be necessary to keep the direct airfield improvements <br />from worsening flood conditions downstream. <br />ENVIRONMENTAL ASSESSMENT (EA) STUDY AREA <br />Hydraulic analysis will need to demonstrate that proposed improvements will not increase flood risk <br />to areas adjacent to the airport. Current hydraulic modeling of the 100 -year (FEMA) floodplain <br />shows water spreading out across a majority of the airport property including over both <br />runways. As a result the indirect study area has been expanded to the north to account for the <br />potential that flood water impacts upstream from the airport property, may need to be addressed <br />in -conjunction with on -airport improvements, so as not to worsen flooding conditions downstream <br />of the Airport. <br />The Indirect Study Area is an area which encompasses the entire Airport and the off-site property to <br />the north on which there is potential for floodplain related effects to nearby Mercer and Whiskey <br />Creeks. The Indirect Study Area will be evaluated for indirect impacts related to the implementation <br />of the proposed projects. <br />The Direct Study Area is an area which encompasses the entire construction footprint for airport <br />improvements associated with the projects. This will allow the project team to understand and <br />evaluate potential direct impacts related to the implementation of the proposed plan. <br />The direct and indirect study areas are the same areas as the direct and indirect APES, respectively, as <br />depicted on the attached "Area of Potential Effect Exhibit". <br />SERVICES TO BE PERFORMED AND PROVIDED BY THE CONSULTANT <br />The following elements will be included in the EA: <br />■ Preliminary (25%) Design of Project Improvements <br />■ Alternatives Analysis <br />■ Agency Contact and Coordination <br />• Permitting Activities <br />■ Preparation of a Draft EA Report <br />■ Conducting a Public Hearing (if requested j <br />■ Preparation of the Final EA Report <br />The scope of work for this project was developed based on discussions with the County and FAA to <br />address specific areas of known interest or concern, provide adequate documentation to address <br />other impact categories, and provide a subsequent briefing with FAA staff and the Airport sponsor. <br />The project will also include project administration tasks as required for the Consultant to provide <br />supervision and direction for their employees and subconsultants, maintain the project schedule, <br />prepare progress reports and project correspondence, prepare invoices for services rendered, and <br />other project administrative tasks. <br />Bowers Field Airport Improvements EA <br />April 27, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.