Laserfiche WebLink
• Produce a compiled set of plans, Special Provisions, and cost estimate from all <br />disciplines. <br />• Develop 90% cost estimate for roadway elements. <br />• Provide responses to 60% Over-The-Shoulder review comments. <br />• Update the Preliminary Basis of Design document for any outstanding issue resolution, <br />project change(s), new/changed design decisions, etc. This document will be <br />considered the Final Basis of Design. <br />• Perform Quality Control per the Project Specific Quality Plan on the deliverables prior <br />to submission to the COUNTY. <br />• DELIVERABLES <br />• STRUCTURES <br />• One (1) set of responses to 60% Over-The-Shoulder Review comments <br />• One (1) set of 90% Plans (in PDF or CAD) <br />• Special provisions for culvert elements <br />• 90% Estimate of Cost for structural items <br />• ROADWAY <br />• One (1) set of responses to 60% Over-The-Shoulder Review comments. <br />• One (1) set of 90% Design Plans (PDF and CAD files) <br />• Special Provisions for roadway elements <br />• One (1) compiled 90% PS&E set <br />• One (1) compiled 90% Cost Estimate <br />• One (1) Final Basis of Design Memo <br />TASK 12.2 -Lick Creek <br />• Added Scope : <br />• ENVIRONMENTAL <br />• Create 90% mitigation/restoration plan set using a landscape architect stamped <br />channel grading, habitat features, and revegetation plan sheets. <br />• HYDRAULICS <br />• Assist with the creek realignment and scour/bank protection design elements. <br />• STRUCTURES <br />• Prepare contract plans for the Lick Creek Culvert Replacement: <br />• General notes on design, construction and materials. <br />• Replacement Layouts, elevations, and typical section(s) <br />• Dimensions and configurations spread footing foundations compatible with <br />premanufactured culvert design as produced and developed by culvert <br />manufacturer. <br />• Develop Special Provisions for structure construction <br />• Develop 90% cost estimate for culvert elements that are not the responsibility of the <br />manufacturer. <br />Scope of Service_Teanaway Hyd lmp_Arnend 01_2018-04-19 <br />Page 11 of 19