Laserfiche WebLink
• Perform Quality Control per the Project Specific Quality Plan on the deliverables prior <br />to submission to the COUNTY. <br />• Provide responses to 60% Over-The-Shoulder review comments <br />• ROADWAY <br />• Prepare contract plans for the Lick Creek culvert replacement, which shall include the <br />following information: <br />• Horizontal Alignment <br />• Vertical Alignment <br />• Typical Sections <br />• Site Prep Plan(s) <br />• Paving Plan(s) <br />• Traffic Barrier(s) <br />• MOT Plan(s) <br />• Detail(s) <br />• Coordination with COUNTY and CONSULTANT team. <br />• Develop Special Provisions for construction, except for structure elements. <br />• Produce a compiled set of plans, Special Provisions, and cost estimate from all <br />disciplines. <br />• Develop 90% cost estimate. <br />• Provide responses to 60% Over-The-Shoulder review comments. <br />• Update the Preliminary Basis of Design document for any outstanding issue resolution, <br />project change{s), new/changed design decisions, etc. This document will be <br />considered the Final Basis of Design. <br />• Perform Quality Control per the Project Specific Quality Plan on the deliverables prior <br />to submission to the COUNTY. <br />• DELIVERABLES <br />• ENVIRONMENTAL <br />• One (1) set of responses to 60% Over-The-Shoulder Review comments. <br />• 90% Plans (in PDF or CAD) <br />• STRUCTURES <br />• One (1) set of responses to 60% Over-The-Shoulder Review comments <br />• 90% Plans {in PDF or CAD) <br />• Special provisions for structure elements <br />• 90% Estimate of Cost <br />• ROADWAY <br />• Response to 60% Over-The-Shoulder Review comments. <br />• 90% Design Plans (PDF and CAD files) <br />• Special Provisions for roadway elements <br />• Compiled 90% PS&E set <br />• 90% Cost Estimate <br />Scope of Service _Teanaway Hyd lmp_Amend 01_2018-04-19 <br />Page 12 of 19