My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Grant
>
Meetings
>
2018
>
03. March
>
2018-03-20 10:00 AM - Commissioners' Agenda
>
Grant
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 12:34:22 PM
Creation date
6/13/2018 12:33:37 PM
Metadata
Fields
Template:
Meeting
Date
3/20/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
b
Item
Request to Approve the Chair's Signature on the Final Report to the Washington State Hazard Mitigation Grant #E-15-243
Order
2
Placement
Consent Agenda
Row ID
43308
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
conducted to ensure due diligence. See Appendix 0 for individual bird surveys <br />conducted. Projects did not occur on wetland issues. Most projects were <br />conducted on steep slopes (above 20 % or greater) that are not as conducive to <br />wetland properties as low topography. <br />9. List of properties treated, with ownership, lot/block/subdivision , tax lot, and digitallat-Iong <br />coordinates for each structure with an accuracy of +-20 meters (64) feet. <br />a. See Appendix E <br />10 . Post-treatment photos of each property or group of properties, if small parcels . <br />a . This requirement is consistent with Checklist item #4. Please see attachment A & C. <br />11. Certificate of occupancy or equivalent documentation from the appropriate regulatory <br />authority for each structure to certify it is code-compliant. <br />a. No retrofits or construction related activities occurred to require this documentation. In <br />accordance to the FONSI only vegetation removal activities occurred within this project <br />agreement and were followed. <br />12. Copy of legally recorded Special Flood Hazard Area for property if located within a <br />designated SFHA. <br />a. Individual project sites were assessed individually and as stated in section 6 . A., of this <br />checklist, no approved scope of work activities occurred within the required buffers, <br />and/or flood plain that would trigger deviation from the approved scope of work and <br />approved best management practices. <br />13. Verification that NFIP policy is in place where required(required for all projects in SFHA). <br />a. Not applicable to this approved project scope of work and approved best management <br />practices.
The URL can be used to link to this page
Your browser does not support the video tag.