My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8-15-Teanaway Res-2017-139
>
Meetings
>
2017
>
08. August
>
2017-08-15 10:00 AM - Commissioners' Agenda
>
8-15-Teanaway Res-2017-139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 12:31:51 PM
Creation date
6/13/2018 12:29:40 PM
Metadata
Fields
Template:
Meeting
Date
8/15/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
m
Item
Request to Approve a Resolution Authorizing the Chair's Signature on the Interagency Agreement with the Federal Highway Administration Authorizing the Reimbursement of Funds to Kittitas County Public Works for the Teanaway Hydraulic Improvement Project
Order
13
Placement
Consent Agenda
Row ID
38819
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Submit before, during, and post construction photographs to FHWA-WFL to document <br />project progress. . <br />4. Submit a copy of the final construction acceptance letter. <br />D. Summary of Deliverables <br />Task Reference Delivery Due On or <br />Paragraph Before Date <br />n. ·l*ltELlMlNARv DES:IGN '. . .. <br />1. DESIGN <br />• Submit a copy of the preliminary plan package and II.C.l.2 March 31, 2018 , preliminary cost estimate , <br />2. ENVIRONMENTAL COMPLIANCE <br />• If applicable, submit a cultural resources report for 1I.C.2.2.1.b With Preliminary Plan <br />FHW A-WFL review. Package <br />I • Submit a report or memorandum identifying the II.C.2.2.2.b With Preliminary Plan <br />presence or absence of jurisdictional wetlands Il.C.2.2.2.c Package <br />• If applicable, submit a report documenting T &E and n.C.2.2.3.h With Preliminary Plan <br />EFH species findings to FHWA-WFL. II.C.2.2.3.c Package <br />• If applicable, submit other environmental surveys, With Preliminary Plan studies, and assessments as needed to support II.C.2.2.4.h Package <br />I environmental comEliance!o FHWA-WFL. <br />F1NAL'DESI~'f :. ". <br />'. .-,e. ::: <br />1. DESIGN <br />• Submit final plans, specifications, and construction 1l.D.l.2 Dec 31, 2018 estimate. <br />2. ROW ACQUISITION <br />• Submit certification of rights-of-way and/or easements <br />to FHW A-WFL -or-include certification that all ILD.2.2 With Final PS&E <br />work will occur within existing right-oi-way as part of <br />the administrative record. <br />3. UTILlTY RELOCA nON I <br />• Submit celtification· of Utility Relocation ILD.3.2 With Final PS&E <br />4. PERMITS <br />• Submit a list of all permits necessary for construction II.D.4.1 With Preliminary Plan <br />toFHWA-WFL Package <br />• Submit copies of all completed applications for ILD.4.2 With Final PS&E necessary penn its to FHW A-WFL: <br />• Submit copies of approved pennits. ILD.4.3 With Final PS&E <br />5. ADVERTISEMENT <br />• Submit Notice of Contract Award to FHW A-WFL II.D.S.3 L <br />Upon A ward! (March, 31 <br />2019) <br />D. CONsi'RUCTION --.....,---- <br />• Submit before, during, and post construction Il.E.3 I Ongoing photographs to FHWA-WFL I j
The URL can be used to link to this page
Your browser does not support the video tag.