Laserfiche WebLink
Atkinson Construction <br />5274 Lodge Creek Culvert Replacement <br />Phil Larson <br />Activity <br />Resource <br />Desc <br />BID ITEM = 60000 <br />Description = Box Culvert <br />:JSOO9696 EqulpmeDt Support <br />Pes <br />5CR300 300 TON CRANE REN@1 LOO <br />5CR300MOB 300 TON CRANE MOB@ LOO <br />5CR3000SMOB 300 TON CRANE ONS@! 1.00 <br />$33,375 .67 <br />Quantity <br />Unit <br />12 .00 HR <br />1.00 EA <br />1.00 EA <br />-> Item Totals: 60000 -Box Culvert <br />$41,092.05 72.0000 WIlLS 72.00 MIl <br />41,092.050 I LS <br />BID ITEM = 70000 <br />Description = BarricrlMBGR <br />60010115 F&I MBGR <br />Still need final quantities <br />Assume 4 flared end sections <br />4FLARET Flared End@108% 1.00 4.00 EA <br />60010117 F&IBarrier <br />Still need final quantities <br />Assume 60' of type 2. <br />4BARTY2 F&I Type 2 Barric@108% 1.00 60 .00 LF <br />=> Item Totals: <br />$20 ,196.00 <br />70000 -BarrlerfMBGR <br />20,196.000 I LS <br />BID lTEM = 75000 <br />Description = HMA <br />18000011 HMA <br />Gues s on the tonage for now. <br />4HMAM Mob HMA@108% <br />4HMAT HMA@108% <br />$25,542 .0 0 <br />1.00 <br />1.00 <br />~-=> Item Totals: <br />$25,542 .00 <br />75000 -HMA <br />25,542.000 I LS <br />BID ITEM = 80000 <br />Description = Traffic Control <br />1.00 LS <br />150.00 TON <br />Cost Report <br />Unit <br />Cost <br />Equip. <br />Labor All Costs <br />Land !L~m SCHEDULE: 100 <br />Unit= LS Takeoff Quan: <br />Expend . <br />Matis. <br />1.000 <br />07/26/2016 <br />Perm. Sub <br />Matis. Contract <br />EngrQuan: <br />Total <br />1.000 <br />Page 6 <br />16:26 <br />QuaD: 1.00 LS IIn/SbIt: S.OO Cal: 50S WC; WA0201 <br />Land Item <br />545.000 <br />15,000.000 <br />4,000.000 <br />[ 1 <br />[ 3954.54 1 5,761 <br />5,761.26 <br />SCHEDULE: <br />8,546 <br />19,602 <br />5,227 <br />33,376 <br />33,375.67 <br />199 34,152 <br />199.11 34,151.58 <br />100 <br />Unit = LS TakcoffQuan: 1.000 <br />980 <br />980.10 <br />EngrQuan: <br />··Unreviewed <br />8,546 <br />19,602 <br />5,227 <br />33,376 <br />33,375.67 <br />41,092 <br />41,092.05 <br />1.000 <br />QuaD: 1.00 LS HnlShrt: 8.00 Cal: 50S WC:WA0201 <br />··Unrevicwed <br />3,500.000 16,632 16,632 <br />Quan: 1.00 LS HrslSbft: 8.08 Cal: 508 WC:WA0201 <br />"·Unrcvicwed <br />50.000 3,564 3,564 <br />[ 1 20,196 20,196 <br />20,196.00 20,196.00 <br />Land Item SCHEDULE: 100 <br />Unit = LS TakeoffQuan: 1.000 EngrQuan: 1.000 <br />Quan: 150.00 TON HnlSbft: 8.00 Cal: 508 we: WA0201 <br />5,000.000 <br />110.000 <br />[ 1 <br />[ 1 <br />Land Item SCHEDULE: 100 <br />Unit = LS Takeoff Quan: 1.000 <br />5,940 <br />19,602 <br />25,542 <br />170.28 <br />... ·Unrcviewcd <br />5,940 <br />19,602 <br />25,542 <br />170.28 <br />25,542 25,542 <br />25,542.00 25,542.00 <br />EngrQuan: 1.000