Laserfiche WebLink
Atkinson Construction <br />5274 Lodge Creek Culvert Replacement <br />Phil Larson <br />Activity <br />Resource <br />Desc Quantity <br />Pes Unit <br />Cost Report <br />Unit <br />Cost <br />Equip . Expend. <br />Labor All Costs MatIs. <br />Page 7 <br />07126/2016 16:26 <br />Penn. Sub <br />Matis. Contract Total <br />BID ITEM = 80000 Land Item SCHEDULE: 100 <br />Description = Traffic Control <br />15001005 Buy Traffic CODtrol Mati <br />At lhis point we don't know what we need. <br />Below are plug pricing for different material. <br />For now we will plug <br />3 PCMS <br />100 Drums <br />10 Type 3 <br />3TCBRL TC BARRELS@108% 1.00 <br />3TCBRLLGT TC BARREL LIGHTS@1O 1.00 <br />100.00 EA <br />1.00 EA <br />3TCBRLLGTBATTC BARREL UGHT B@l 1.00 1.00 EAMO <br />3TCCLBSIGN TC CLASS B SIGNS@108 1.00 <br />3TCFLGSTA TC FLAGGINGSTATI@l 1.00 <br />3TCPCMS TC PCMS@I 08% 1.00 <br />3TCSIGNSTND TC SIGN STANDS@108% 1.00 <br />3TCSPECSIGN TC SPECIAL SIGNS@108 1.00 <br />3TCTY2BAR TC TYPE 2 BARRICA@lO 1.00 <br />3TCTY3BAR TC TYPE 3 BARRICA@IO 1.00 <br />3TCWHITES WHITE SUITS FOR T@lO 1.00 <br />$16,657 .78 <br />15001045 FlaggiDg/Spotting <br />Assume a 4 person crew during c10suer <br />1 TCS and 3 Labs <br />TCFLAQ TC -FLAGGING <br />8GENU ENG DRIVEN LITE TOW 1.00 <br />8TRPU450 FLATRACK., BAREBED 1.00 <br />LeOM LABORER, COMMON G# 1.00 <br />LFLAGGER LABORER, PLAGGER G# 2.00 <br />LFM LABORER FOREMAN 1.00 <br />$23,797.75 4 .0000 MHIMH <br />4.0000 MlIlUnit <br />1.00 SF <br />1.00 EA <br />3.00 EAMO <br />1.00 EA <br />1.00 SF <br />1.00 EA <br />10.00 EA <br />1.00 EA <br />72.00 <br />72.00 HR <br />72.00 HR <br />72.00 MH <br />144.00 MH <br />72.00 MH <br />288.00 MH <br />1.0000 UnitslHr <br />> Item Totals: 80000 -Traffie Control <br />$40,455.53 288 .0000 MHILS 288.00 MH <br />40,455.530 1 LS <br />PARENT ITEM = 999000 <br />Description = Project Indirects <br />Listing of Sub-Blditems of Parent Item 999000: <br />Unit = LS TakeoffQuan: 1.000 Engr Quan: 1.000 <br />Quam 1.00 LS HrslSbft: H.OO Cal: 508 WC: WA0201 <br />··Unrcviewed <br />60.000 7,841 7,841 <br />20.000 26 26 <br />2.000 3 3 <br />10.000 13 13 <br />2,000.000 2,614 2,614 <br />\,000.000 3,920 3,920 <br />100.000 131 131 <br />15.000 20 20 <br />50.000 65 65 <br />150.000 1,960 1,960 <br />50.000 65 65 <br />[ 1 16,658 16,658 <br />16,657.78 16,657.78 <br />QuaD: 72.00 MH Hrs/Sbft: 12.0Q Cal: 612 WC: WA0201 <br />"·Unrevjewed <br />CH Prod: 6.0000 S Lab Pes: 4 .0 0 Eqp Pes: 2.00 <br />11. 718 1,021 <br />16.167 1,408 <br />34.420 5,707 <br />27.530 9,630 <br />36.920 6,031 <br />[ 199 .287 J 21,368 2,429 <br />296.78 33 .74 <br />[ 14348 .65] 21,368 2,429 16,658 <br />21,368.44 2,429.31 16,657.78 <br />Unit = LS Takeoff Quan: 1.000 EngrQuan: <br />1,021 <br />1,408 <br />5,707 <br />9,630 <br />6,031 <br />23,798 <br />330.52 <br />40,456 <br />40,455.53 <br />1.000 <br />BID ITEM == 999100 Land Item SCHEDULE: 100 <br />Description = <br />010005 <br />SACONMGR <br />SASU <br />SASUGEN <br />$19,533.83 <br />SUPERVISION/PROJECT MGMT <br />SupervbloD <br />==> <br />==> <br />==> <br />1.00 <br />1.00 <br />1.00 <br />0.50 MO <br />0.00 MO <br />0.50 MO <br />Unit = LS Takeoff Quan: 1.000 EngrQuan: 0.0 00 <br />QuaD: 1.00 MO Un/Sbft: 8.00 Cal: 508 WC; WA4900 <br />17,137.000 <br />11,259.000 <br />13,148.000 <br />[ J <br />11,053 <br />8,480 <br />19,534 <br />19,533.83 <br />"Unreviewcd "8unun Code: TRO <br />11,053 <br />8,480 <br />19,534 <br />19,533.83