Atkinson Construction Page 5 <br />5274 Lodge Creek Culvert Replacement 07/26/2016 16:26 <br />Phil Larson <br />Activity <br />Resource <br />Dese <br />BID ITEM '" 50000 <br />Description = 72 HR Closure <br />SLOSKID SKIDSTEER <br />LCOM LABORER, COMMON G# <br />OBH OP ENG BACKHOE <3CY <br />OBHL OP ENG BACKHOEIL<75 <br />ODL OP ENG DOZER D9 & < <br />OFELL OP ENG FE LOR <6 CY G <br />OGRADE OPENGGRADECHECKE <br />Quantity <br />P e s Unit <br />1.00 411 .00 HR <br />1.50 72.00 MH <br />1.00 48.00 MH <br />2.00 96.00 MH <br />1.00 48.00 MH <br />1.00 4S .00 MH <br />1.00 48.00 MH <br />$48,685.72 7.5000 MHlHR 360.00 MH <br />Cost Report <br />Unit <br />C ost <br />Equip. Expend. <br />Labor All Costs Matis. <br />Land Item SCHEDULE: 100 <br />Unit = LS TakeoffQuan: 1.000 <br />21.473 1,347 <br />34.420 5,707 <br />39.570 4,731 <br />39.120 9,384 <br />39.120 4,692 <br />39.570 4,731 <br />36 .610 4,475 <br />[ 448.932] 33,719 14,967 <br />7.5000 MHlUnit 1.0000 UnitslHr 702.48 311.80 <br />> Item Totals: 50000 -72 HR Closure <br />Penn. Sub <br />MatIs. Contract <br />Engr Quan : <br />Total <br />1.000 <br />1,347 <br />5,707 <br />4,731 <br />9,384 <br />4,692 <br />4,731 <br />4,475 <br />48,686 <br />1,014.29 <br />$99,588.06 720.0000 MHILS 720.00 MH [ 43136.81] <br />99,588.060 I LS <br />67,483 <br />67,483 .31 <br />32,105 <br />32,104.75 <br />99,588 <br />99 ,588.06 <br />BID ITEM "" 60000 <br />Description = Box Culvert <br />35009610 Buy Grout <br />Use 5 cy fo r a short load . <br />2CONCIO CONCRETE-10 SACK@I <br />5CONPCY3942 CYRATE 39-42 MET@IO <br />5CONPHR42M 42 METER PUMP@108% <br />$1 ,756.01 <br />35009c.31 Set Box <br />1.00 <br />1.00 <br />1.00 <br />Assume 4 hour to set bottom of box. <br />LAB6 6 MAN LABOR CREW <br />LCOM LABORER, COMMON G# 5 .00 <br />LFM LABORER FOREMAN 1.00 <br />$1,920.42 24 .0000 MHILS <br />24.0000 MHlUnit <br />35009635 Grout Box <br />As s ume 4 hours to grout and c leanup . <br />LAB6 6 MAN LABOR CREW <br />8AC375 COMPRESSOR PORT 375 LOO <br />8WELD400D <br />LCOM <br />LFM <br />$2,119.53 <br />35009640 <br />WELDER 400 AMP LOO <br />LABORER, COMMON G# 5.00 <br />LABORER FOREMAN LOO <br />Set Top <br />24 .0000 MHILS <br />24 .0000 MHlUnit <br />Assume 4 hours to set top. <br />Land Item <br />Unit = <br />QuiD: <br />5.00 CY <br />5.00 CY <br />4.00 HR <br />QuiD: <br />4 .00 CH <br />SCHEDULE: <br />LS Takeoff Quan: <br />5.00 CY <br />150.000 <br />2.750 <br />145.000 <br />[ ] <br />1.00 LS <br />Prod: <br />34.420 <br />36.920 <br />Hrs/Shlt: <br />Hrs/ShR: <br />0.3333 S <br />1,585 <br />335 <br />100 <br />1.000 EngrQuan: <br />8.80 Cal: 508 WC: WA0201 <br />980 <br />18 <br />758 <br />776 980 <br />155.18 196.02 <br />12.00 Cal: 612 WC: WA0201 <br />Lab Pes: 6 .00 Eqp Pes: <br />20.00 MH <br />4.00 MH <br />24.00 MH <br />0.2500 UnitslHr <br />[ 1318.18) 1,920 <br />1,920.42 <br />QuaD: 1.00 LS HralShrt: 12.00 Cal: 611 WC: WAOlO! <br />4.00 Cll PrDd: 0.3333 S Lab Pes: 6.00 EqpPcs: <br />4.00 HR 25.575 134 <br />4.00 HR 12.520 65 <br />20.00 MH 34.420 1,585 <br />4.00 MH 36.920 335 <br />24.00 MH [ 13l8.18 J 1,920 199 <br />0 .2500 UnitslHr 1,920.42 199.11 <br />QuaD: 1.80 LS Hrs/Shft: 12.00 Cal: 612 WC: WA010I <br />6 man cre w f o r 1 1 2 hr shift to s e t bo t tome, top and gro ut. <br />~ 6 MAN LABOR CREW 4 .00 ClI <br />LCOM <br />LFM <br />$1 ,920.42 <br />LABORER., COMMON G# 5 .00 <br />LABORER FOREMAN 1.00 <br />24 .0000 MH/LS <br />24 .0000 MHlUnit <br />20.00 MH <br />4.00 MH <br />24.00 MH <br />0 .2500 UnitstHr <br />Prod: <br />34.420 <br />36.920 <br />[ 1318.18] <br />0.3333 S <br />1,585 <br />335 <br />1,920 <br />1,920.42 <br />Lab Pes: 6.00 Eqp Pes: <br />1.000 <br />"Unreviewed <br />980 <br />18 <br />758 <br />1,756 <br />35 1,20 <br />··Unreviewed <br />0.00 <br />1,585 <br />335 <br />1,920 <br />1,92D.42 <br />2.00 <br />134 <br />65 <br />1,585 <br />335 <br />2,120 <br />2,119 .53 <br />··Unrcviewed <br />0.00 <br />1,585 <br />335 <br />1,920 <br />1,920.42