My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA CH2M Hill Engineers
>
Meetings
>
2016
>
10. October
>
2016-10-18 10:00 AM - Commissioners' Agenda
>
PSA CH2M Hill Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2018 8:42:50 AM
Creation date
6/13/2018 11:18:11 AM
Metadata
Fields
Template:
Meeting
Date
10/18/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
h
Item
Request to Approve a Professional Service Agreement with CH2M for a Feasibility Study for the Ellensburg Transfer Station
Order
8
Placement
Consent Agenda
Row ID
32565
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Transfer Loading Technologies (open top, pre-compactor) <br />• Transfer Vehicle weighing options <br />D Architectural Features <br />o Scalehouse <br />11 Number of scales <br />• Work Area Requirements <br />• Weighing Software <br />o Administration Building <br />• No. of Offices <br />• Location of Building <br />• Breakroom/Training Requirements <br />• Rest Room Facilities (staff and customers) <br />• Architectural Features <br />o Composting Area <br />11 Unloading Area <br />• Future organics feedstocks <br />• Processing technology <br />• Green Waste Processing <br />.' Composting Area <br />• Load-out Options <br />• Leachat,e control <br />• Stormwater control <br />o Moderate Risk Waste Facility <br />• Type of materials accepted <br />• Customer Processing Options <br />.' Material Packaging and Shipment Procedures <br />• Facility sizing <br />• Architectural Features <br />o Recycling Drop-off <br />• Types of Materials Accepted and Space Required <br />11 Container Options <br />11 Material Transfer Options <br />• Storage Requirements <br />• Traffic Pattern Considerations <br />0 Commercial <br />0 Self-Haul <br />0 Green Waste <br />0 Recycling <br />0 Moderate Risk Waste <br />. 0 Employees <br />o Traffic Guidance (direction, backing, no. of crossings) <br />o Roadway Features (minimum turning radii, width, asphalt) <br />o Heavy traffic areas (concrete, asphalt) <br />• Stormwater Management Structures <br />o Transfer Building <br />Professional Services Agreement <br />Page 16
The URL can be used to link to this page
Your browser does not support the video tag.