Laserfiche WebLink
o Compost Area <br />o Run-off Structures (treatment, ponds, swales) <br />" Odor Management <br />• Staff requirements <br />• Mobile equipment <br />• Parking <br />o Staff, Vendors, Visitors, Transfer Trailers, Other <br />• Buffer Zone Requirements <br />• Other Facilities (3,d party material processing facilities) <br />" Permitting or local design requirements/code that will impact design <br />CH2M will conduct facility tours, kick-off meeting, and workshop within an 8-hour timeframe. A <br />meeting summary will be prepared summarizing facility tour observations, kick-off meeting items, and <br />workshop discussions and decisions. <br />Task 3: Conceptual Facilitv Lavout <br />CH2M will develop a conceptual facility layout incorporating decisions made at the workshop. The <br />following conceptual drawings (using AutoCAD) will be prepared for the facility : <br />" Overall Site Plan <br />o Facilities and Composting Areas <br />o Roads <br />o Stormwater Structures <br />o Parking <br />• Transfer Building Plan <br />o . Tipping Floor <br />o Load Out Port <br />• Transfer Building Elevations (2) <br />• 3D Drawing <br />• Scalehouse and Administration Building Plan <br />" Composting Area Plan <br />• Moderate Risk Waste Building Plan <br />• Recycling Drop-Off Plan <br />CH2M will transmit two draft conceptual plan sets to the County for review and comment. CH2M will <br />conduct a meeting with the County to discuss comments. Three copies of final conceptual plan set and <br />one PDF will be transmitted to the County. <br />Task 4: Basis of Design Report <br />CH2M will prepare a draft Basis of Design (BOO) report that will include the following information: <br />• Introduction <br />• Design Parameters <br />• Conceptual Layout <br />Professional SeNices Agreement <br />Page 17