My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Roslyn Firemans Park
>
Meetings
>
2016
>
08. August
>
2016-08-16 10:00 AM - Commissioners' Agenda
>
Roslyn Firemans Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2018 8:43:06 AM
Creation date
6/13/2018 11:13:40 AM
Metadata
Fields
Template:
Meeting
Date
8/16/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
j
Item
Request to Allocate $234,378 from the Hotel/Motel Funding for the Small-Scale Municipality-Owned Capital Projects and Operations - $93,973 to be used for Capital Projects, and $140,405 to be used for Operations
Order
10
Placement
Consent Agenda
Row ID
31338
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This building is the office of the City's street superintendent. Used as storage for utilities and to repair <br />street equipment and materials. It was built in 1997. At this time it is plumbed for water and sewer but <br />still needs a bathroom. <br />PR-S -BATHROOM INSTALL <br />Schedule: 2017 <br />Estimated Cost: $2,000 <br />This project would include <br />PR-6 -STORAGE <br />Schedule: 2016 <br />Estimated Cost: $50,000 <br />This project would include <br />JENSON CABIN -407 N 2ND ST <br />This cabin was originally constructed prior to 1886. It is a log structure and was the first structure <br />built in the original town plat of Roslyn. Nez "Cayuse" Jensen was the cabin's original owner. <br />Jensen filed a 160-acre claim that is much of Roslyn today. The cabin housed transient workers <br />until the 1970's. In 2002/2003, the cabin was lifted and the logs suffering dry-rot were replaced <br />and inappropriate additions were removed. More funds are needed to finish repairing the <br />structure. <br />PR-7 -INTERIOR <br />Schedule: 2020 <br />Estimated Cost: $50,000 <br />This project would include finishing the interior (one room and a loft), updating and install plumbing & <br />electrical. Once projects are completed the City intends to convert the cabin into a visitor's center. <br />OLD PUBLIC RESTROOMS -3RO ST & ARIZONA AVE <br />The restrooms are located in Pioneer Park. <br />PR-S -IMPROVEMENTS <br />Schedule: 2016 <br />Estimated Cost: $25,000 <br />This project would include ADA accessibility. <br />REFUSE FACILITY -MEMORIAL DR. <br />Refuse facility (burn dump). Property owned by City on outskirts of the cemeteries. The burn dump is <br />located inside the cemeteries. The burn dump is being closed to burning and the City would like to <br />research the feasibility of recycling, composting and biomass feedstock for boiler fuel. <br />PR-9 -RESEARCH <br />Schedule: 2016 <br />Estimated Cost: $ <br />This project would include conducting research regarding boiler fuel. <br />FIRE FACILITIES PLAN <br />June 15, 2016
The URL can be used to link to this page
Your browser does not support the video tag.