My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Roslyn Firemans Park
>
Meetings
>
2016
>
08. August
>
2016-08-16 10:00 AM - Commissioners' Agenda
>
Roslyn Firemans Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2018 8:43:06 AM
Creation date
6/13/2018 11:13:40 AM
Metadata
Fields
Template:
Meeting
Date
8/16/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
j
Item
Request to Allocate $234,378 from the Hotel/Motel Funding for the Small-Scale Municipality-Owned Capital Projects and Operations - $93,973 to be used for Capital Projects, and $140,405 to be used for Operations
Order
10
Placement
Consent Agenda
Row ID
31338
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
As part of their Water Use Efficiency Program, the City is committed to accurately metering and billing <br />for water used by customers. Service meters normally have a life of approximately 10 to 20 years. The <br />existing service meters were mostly installed during the 1992 project. Consequently, they are near the <br />end of their expected life. The amount budgeted should allow for the City to replace approximately 120 <br />meters annually. <br />PROJECT O&M-2: FINISHED WATER METER <br />Schedule: 2016 <br />Estimated Cost: $7,100 <br />The City has experienced decreased demand during the winter, resulting in flows outside of the ideal <br />flow range for the 12-inch finished water meter. The City plans to replace the existing meter with a <br />smaller mag-meter to increase meter accuracy. <br />PROJECT O&M-6: TURBIDIMETER REPLACEMENT <br />Schedule: 2016 <br />Estimated Cost: $25,000 <br />By 2018 the treatment plant will have been online for 20 years, which is the typical life span of <br />turbidimeters. As a result the City plans to replace three turbidimeters with newer models. <br />PROJECT O&M-9: CLEAN INTAKE POND <br />Schedule: 2019 <br />Estimated Cost: $71,300 <br />The City plans to clean and rehabilitate the intake pond in Domerie Creek within the 20-year planning <br />period to ensure adequate storage and withdrawal capacity. <br />6-YEAR CAPITAL IMPROVEMENT PLAN <br />Table 1 summarizes the proposed capital improvement projects for the 6-year planning period. Each <br />project is discussed further in the paragraphs above. Detailed cost estimates for the capital <br />improvement projects are included in Appendix K. The transmission and distribution system project <br />costs in Table 1 include 20 percent contingency and 25 percent engineering and administration. O&M <br />costs include 20 percent contingency and 10 percent engineering and administration unless otherwise <br />noted. Project costs are projected forward with 3 percent inflation annually as well. <br />WASTEWATER (SEWER) SYSTEM PLAN <br />The original sewer system for the City of Roslyn was constructed in the early 1900s as a combined storm <br />and sewer system with direct discharges to Crystal Creek. Currently, the sewer system serves <br />approximately 754 customers. In 1973, the City constructed a two-cell facultative lagoon system and <br />constructed a sewer trunk line to Roslyn. Around this time sewer collections systems were expanded to <br />include low lying areas in the southeast portions of town. In 1984, the City replaced much of the system, <br />including side sewers, in the northwest portion of the City. In 1988, the City completed sewer <br />improvements intended to decrease inflow and infiltration problems at select locations in the central <br />portion of the City. In 1989, an eight-inch PVC sewer main was extended from 3rd Avenue along alleys <br />between Montana Avenue and West Oregon Avenue. In addition, the main trunk line was extended at <br />the wastewater treatment plan with sixteen-inch ductile iron pipe and twenty-one-inch concrete pipe as <br />part of wastewater treatment plant improvements. A sewer project was completed in 2004 at East <br />June 15, 2016
The URL can be used to link to this page
Your browser does not support the video tag.