Pennsylvania A, B, C, D Streets, and Colorado. The equalization basin and the coal mine trail interceptor <br />projects were started and completed in 2006. <br />NO PROJECTS FORECASTED: <br />WASTEWATER TREATMENT PLAN & OPERATIONS BUILDING - N 5 RD <br />The original two-lagoon system was built in 1973 and updated with an addition of a third lagoon and the <br />building that contains the chlorine contact tank and aeration basin in 1989. In 2006/2007 when the City <br />joins the regional sewer system it will be converted to an attenuation basin. <br />STORM SYSTEM PLAN <br />The Storm water system is made up of the old sewer system. The sewer system was upgraded in 1973 <br />allowing the City of Roslyn to separate sewer and storm water. The storm water utility was created in <br />1996 and the system designed in 1997. The construction ofthe facility was done with a grant. Much of <br />the work has been done already to separate the storm water and sewer system . <br />CAPITAL IMPROVEMENT PROJECTS: <br />The hydraulic model results identified locations where the conveyance system was under capacity and <br />required larger pipes. City staff identified sections of the existing stormwater system that require <br />maintenance or replacement. A goal of the City is to locate all drainage facilities in right-of-way or City <br />owned property. The projects identified in the CIP plan support this goal. <br />The projects described below are developed based on the hydraulic model results and input from City <br />staff. Survey should be conducted as part of the design of any recommended capital improvement <br />project to ensure the most accurate and effective design for the project. All recommended projects <br />assume that the existing slope will be utilized in the future. <br />CIP 1-PENNSYLVANIA PLACE BOTILENECK <br />Schedule: 2016 <br />Estimated Cost: $230,000 <br />City staff has identified the pipe section south of Washington Avenue as the highest priority for <br />replacement in the stormwater system because of the bottleneck that occurs at this location. The <br />hydraulic model results indicate that this section has capacity to convey less than 15 percent of the flow <br />from the 2-year storm event. To convey the 10-year peak flow of 186 cfs 325 feet of 24-inch-diameter <br />pipe should be replaced with 48-inch-diameter pipe. <br />CIP 2 -SOUTH A STREET CULVERT <br />Schedule: 2016 <br />Estimated Cost: $220,000 <br />City staff has identified the culvert at South A Street, north of West Hoffmanville Avenue as a priority for <br />replacement. The existing parallel 30-inch-diameter pipes do not have sufficient capacity to convey the <br />10-year peak flow of over 350 cfs. This culvert conveys flow for Crystal Creek and must meet the design <br />guidelines in "Design of Road Culverts for Fish Passage," from Washington Department of Fish and <br />Wildlife. The cost estimates here use the Stream Simulation Design Option resulting in a box culvert of <br />dimensions 5-feet tall, 8-feet wide and 60-feet long. <br />June 15, 2016