My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Roslyn Firemans Park
>
Meetings
>
2016
>
08. August
>
2016-08-16 10:00 AM - Commissioners' Agenda
>
Roslyn Firemans Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2018 8:43:06 AM
Creation date
6/13/2018 11:13:40 AM
Metadata
Fields
Template:
Meeting
Date
8/16/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
j
Item
Request to Allocate $234,378 from the Hotel/Motel Funding for the Small-Scale Municipality-Owned Capital Projects and Operations - $93,973 to be used for Capital Projects, and $140,405 to be used for Operations
Order
10
Placement
Consent Agenda
Row ID
31338
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pennsylvania A, B, C, D Streets, and Colorado. The equalization basin and the coal mine trail interceptor <br />projects were started and completed in 2006. <br />NO PROJECTS FORECASTED: <br />WASTEWATER TREATMENT PLAN & OPERATIONS BUILDING - N 5 RD <br />The original two-lagoon system was built in 1973 and updated with an addition of a third lagoon and the <br />building that contains the chlorine contact tank and aeration basin in 1989. In 2006/2007 when the City <br />joins the regional sewer system it will be converted to an attenuation basin. <br />STORM SYSTEM PLAN <br />The Storm water system is made up of the old sewer system. The sewer system was upgraded in 1973 <br />allowing the City of Roslyn to separate sewer and storm water. The storm water utility was created in <br />1996 and the system designed in 1997. The construction ofthe facility was done with a grant. Much of <br />the work has been done already to separate the storm water and sewer system . <br />CAPITAL IMPROVEMENT PROJECTS: <br />The hydraulic model results identified locations where the conveyance system was under capacity and <br />required larger pipes. City staff identified sections of the existing stormwater system that require <br />maintenance or replacement. A goal of the City is to locate all drainage facilities in right-of-way or City <br />owned property. The projects identified in the CIP plan support this goal. <br />The projects described below are developed based on the hydraulic model results and input from City <br />staff. Survey should be conducted as part of the design of any recommended capital improvement <br />project to ensure the most accurate and effective design for the project. All recommended projects <br />assume that the existing slope will be utilized in the future. <br />CIP 1-PENNSYLVANIA PLACE BOTILENECK <br />Schedule: 2016 <br />Estimated Cost: $230,000 <br />City staff has identified the pipe section south of Washington Avenue as the highest priority for <br />replacement in the stormwater system because of the bottleneck that occurs at this location. The <br />hydraulic model results indicate that this section has capacity to convey less than 15 percent of the flow <br />from the 2-year storm event. To convey the 10-year peak flow of 186 cfs 325 feet of 24-inch-diameter <br />pipe should be replaced with 48-inch-diameter pipe. <br />CIP 2 -SOUTH A STREET CULVERT <br />Schedule: 2016 <br />Estimated Cost: $220,000 <br />City staff has identified the culvert at South A Street, north of West Hoffmanville Avenue as a priority for <br />replacement. The existing parallel 30-inch-diameter pipes do not have sufficient capacity to convey the <br />10-year peak flow of over 350 cfs. This culvert conveys flow for Crystal Creek and must meet the design <br />guidelines in "Design of Road Culverts for Fish Passage," from Washington Department of Fish and <br />Wildlife. The cost estimates here use the Stream Simulation Design Option resulting in a box culvert of <br />dimensions 5-feet tall, 8-feet wide and 60-feet long. <br />June 15, 2016
The URL can be used to link to this page
Your browser does not support the video tag.