Estimated Cost: $769,500 <br />This project would replace existing steel transmission main along Nelson Dairy Road to the City's <br />reservoir. The project would entail 3,500 linear feet of 12-inch ductile iron transmission main, valves, <br />and appurtenances. The line would replace the existing leaking line to reduce leakage and increase <br />system reliability. <br />PROJECT 0-2: SOUTH THIRD STREET AND SR 903 WATER MAIN TO HIGH <br />SCHOOL REPLACEMENT <br />Schedule: 2018 <br />Estimated Cost: $1,231,600 <br />The City plans to replace 6,000 LF of the existing coal tar-lined steel 10-inch pipe that supplies the <br />schools in the southeast part of the system. The lO-inch water main will be replaced with 12-inch PVC <br />from South 3rd Street and West California Avenue to the schools. The remaining 2,500 LF of the pipe <br />that continues from South 3rd Street and West California Avenue to South Pennsylvania Street will be <br />abandoned in place. <br />PROJECT 0-3: HORVATT ROAD 4-INCH WATERLlNE REPLACEMENT <br />Schedule: 2020 <br />Estimated Cost: $457,000 <br />This project would replace approximately 2,600 linear feet of 4-inch waterline on Horvatt Road with 8- <br />inch PVC pipe to increase fire flow to the area. <br />PROJECT WTP-1: WATER TREATMENT PLANT EXPANSION <br />Schedule: 2020 <br />Estimated Cost: $968,500 <br />This project would upgrade the existing slow sand facility from 1.0 mgd to 1.5 mgd by adding a third <br />slow sand filter bed . The project would include the third bed, filter media, site piping and <br />appurtenances, site work, and instrumentation and electrical . <br />PROJECT M-1: RESERVOIR COVER REPLACEMENT/REHABILITATION <br />Schedule: 2017 <br />Estimated Cost: $81,300 <br />Although still in good condition, the existing reservoir cover will likely require replacement or <br />rehabilitation within the 6-year planning period. <br />PROJECT M-2: BRIDGE MAINTENANCE AND PAINTING <br />Schedule: 2017 <br />Estimated Cost: $384,000 <br />With the transmission main being replaced on the bridge, the bridge requires on-going maintenance to <br />ensure reliability and reduce the risk of bridge failure. Minor structural repairs will be completed, <br />including replacing approximately 100 corroded rivets with high strength bolts. Additionally, spot paint <br />repairs will be made to prevent further corrosion. Due to the sensitive nature of the Cle Elum River, the <br />bridge will be fully contained during painting. <br />PROJECT O&M-1: SERVICE METER REPLACEMENT <br />Schedule: 2017 <br />Estimated Cost: $10,000 annually <br />June 15, 2016