Laserfiche WebLink
CAPITAL IMPROVEMENT PROJECTS: <br />In the future other projects may arise that are not identified as part ofthe City's water system CIP. Such <br />projects may be deemed necessary for ensuring water quality, preserving emergency water supply, <br />accommodating transportation improvements proposed by other agencies, or addressing unforeseen <br />problems with the City's water system. Due to budgetary constraints, the completion of these projects <br />may require that the proposed completion date for the projects in the CIP be rescheduled. The City <br />retains the flexibility to reschedule proposed projects and to expand or reduce the scope of proposed <br />projects, as best determined by the City when new information becomes available for evaluation. <br />The CIP is categorized into five categories: <br />• Transmission Projects (T) <br />• Distribution System Projects (D) <br />• Water Treatment Plant Projects (WTP) <br />• Miscellaneous Projects (M), and <br />• Operation and Maintenance Projects (O&M) <br />Each category is further divided into a detailed list of projects presented chronologically over the 6-year <br />and 20-year planning periods. Projects after the 6-year planning period are described along with a cost <br />estimate, but are not scheduled for a specific year. <br />PROJECT T -2: TRANSMISSION MAIN REPLACEMENT WEST OF RIVER CROSSING PHASE 1 <br />Schedule: 2017 <br />Estimated Cost: $368,900 <br />This project would replace the existing steel transmission main through the Pearson, Schneringer, and <br />Freeman private properties west of the river crossing. The project entails 1,800 linear feet of 12-inch <br />ductile iron transmission main, valves, and appurtenances. The line would replace the existing leaking <br />line to reduce leakage and increase system reliability. <br />PROJECT T -3: TRANSMISSION MAIN REPLACEMENT WEST OF RIVER CROSSING PHASE 2 <br />Schedule: 2017 <br />Estimated Cost: $857,300 <br />This project would replace the portions of the existing steel transmission main through the private <br />properties west of the river crossing not replaced in Phase 1. The project entails 3,800 linear feet of 12- <br />inch ductile iron transmission main, valves, and appurtenances. The line would replace the existing <br />leaking line to reduce leakage and increase system reliability. <br />PROJECT T-4: TRANSMISSION MAIN REPLACEMENT EAST OF RIVER CROSSING <br />Schedule: 2019 <br />Estimated Cost: $1,322,400 <br />This project would replace existing steel transmission main from the river crossing to the portion <br />replaced by Suncadia. The project entails 6,100 linear feet of 12-inch ductile iron transmission main, <br />valves, and appurtenances. The line would replace the existing leaking line to reduce leakage and <br />increase system reliability. <br />PROJECTT-5: TRANSMISSION MAIN REPLACEMENT BETWEEN WTPAND RESERVOIR <br />Schedule: 2019 <br />June 15, 2016