My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Roslyn Firemans Park
>
Meetings
>
2016
>
08. August
>
2016-08-16 10:00 AM - Commissioners' Agenda
>
Roslyn Firemans Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2018 8:43:06 AM
Creation date
6/13/2018 11:13:40 AM
Metadata
Fields
Template:
Meeting
Date
8/16/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
j
Item
Request to Allocate $234,378 from the Hotel/Motel Funding for the Small-Scale Municipality-Owned Capital Projects and Operations - $93,973 to be used for Capital Projects, and $140,405 to be used for Operations
Order
10
Placement
Consent Agenda
Row ID
31338
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAPITAL IMPROVEMENT PROJECTS: <br />In the future other projects may arise that are not identified as part ofthe City's water system CIP. Such <br />projects may be deemed necessary for ensuring water quality, preserving emergency water supply, <br />accommodating transportation improvements proposed by other agencies, or addressing unforeseen <br />problems with the City's water system. Due to budgetary constraints, the completion of these projects <br />may require that the proposed completion date for the projects in the CIP be rescheduled. The City <br />retains the flexibility to reschedule proposed projects and to expand or reduce the scope of proposed <br />projects, as best determined by the City when new information becomes available for evaluation. <br />The CIP is categorized into five categories: <br />• Transmission Projects (T) <br />• Distribution System Projects (D) <br />• Water Treatment Plant Projects (WTP) <br />• Miscellaneous Projects (M), and <br />• Operation and Maintenance Projects (O&M) <br />Each category is further divided into a detailed list of projects presented chronologically over the 6-year <br />and 20-year planning periods. Projects after the 6-year planning period are described along with a cost <br />estimate, but are not scheduled for a specific year. <br />PROJECT T -2: TRANSMISSION MAIN REPLACEMENT WEST OF RIVER CROSSING PHASE 1 <br />Schedule: 2017 <br />Estimated Cost: $368,900 <br />This project would replace the existing steel transmission main through the Pearson, Schneringer, and <br />Freeman private properties west of the river crossing. The project entails 1,800 linear feet of 12-inch <br />ductile iron transmission main, valves, and appurtenances. The line would replace the existing leaking <br />line to reduce leakage and increase system reliability. <br />PROJECT T -3: TRANSMISSION MAIN REPLACEMENT WEST OF RIVER CROSSING PHASE 2 <br />Schedule: 2017 <br />Estimated Cost: $857,300 <br />This project would replace the portions of the existing steel transmission main through the private <br />properties west of the river crossing not replaced in Phase 1. The project entails 3,800 linear feet of 12- <br />inch ductile iron transmission main, valves, and appurtenances. The line would replace the existing <br />leaking line to reduce leakage and increase system reliability. <br />PROJECT T-4: TRANSMISSION MAIN REPLACEMENT EAST OF RIVER CROSSING <br />Schedule: 2019 <br />Estimated Cost: $1,322,400 <br />This project would replace existing steel transmission main from the river crossing to the portion <br />replaced by Suncadia. The project entails 6,100 linear feet of 12-inch ductile iron transmission main, <br />valves, and appurtenances. The line would replace the existing leaking line to reduce leakage and <br />increase system reliability. <br />PROJECTT-5: TRANSMISSION MAIN REPLACEMENT BETWEEN WTPAND RESERVOIR <br />Schedule: 2019 <br />June 15, 2016
The URL can be used to link to this page
Your browser does not support the video tag.