My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutionAuthorizingChairSignatureJacobsTO3Amendment1
>
Meetings
>
2018
>
05. May
>
2018-05-01 10:00 AM - Commissioners' Agenda
>
ResolutionAuthorizingChairSignatureJacobsTO3Amendment1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2018 12:17:08 PM
Creation date
5/14/2018 12:16:47 PM
Metadata
Fields
Template:
Meeting
Date
5/1/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
k
Item
Request to Approve a Resolution to Authorize the Chair's Signature on Jacobs Task Order No. 3 Amendment No. 1 Adding Additional Civil Engineering Services for the Teanaway Hydraulic Improvements Project
Order
11
Placement
Consent Agenda
Row ID
44352
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• DELIVERABLES: <br />♦ No additional deliverables. <br />• Deleted Scope: <br />• Endangered Species Act (ESA) Biological Assessment <br />♦ Provide ongoing coordination with WSDOT <br />• DELIVERABLES: <br />♦ One (1) NEPA CE form. <br />♦ One (1) SEPA checklist <br />TASK 6 ENVIRONMENTAL PERMITTING <br />The original scope of work shown in this task has changed and requires an increased level of <br />effort due to direction from the COUNTY to change the proposed alignment of Lick Creek. The <br />new or deleted scope is shown below: <br />• Added Scope <br />• Populate and submit one (1) additional JARPA application package due to submitting <br />separate packages for Story Creek site and Lick Creek site. <br />• Additional coordination with federal and/or state agencies regarding the development and <br />tracking of two (2) JARPA packages. <br />• Added level of effort for the development of a larger and more complex restoration and <br />mitigation plan. This will include coordination with the design team, biologist, hydraulics, <br />and Landscape Architect. <br />♦ Additional effort to address the larger area of grading and surplus material storage <br />under the Ecology Clean Water Act Section 402 — National Pollutant Discharge <br />Elimination System (NPDES) General Construction Stormwater Permit. <br />• Enhanced SWPPP/SPCC Plan Development <br />• Enhanced TESC Plan Development <br />• DELIVERABLES <br />♦ One (1) additional JARPA package for delivery to USACE, WDEW, DNR, and WDOE. <br />♦ Enhanced Restoration/Mitigation Plan <br />♦ Enhanced SWPPP/SPCC Plan <br />♦ Enhanced TESC Plan(s) <br />• Deleted Scope: <br />• Coordination with federal and/or state agencies for the following permits: <br />♦ Individual Corps 404 Permit coordination for Lick Creek <br />♦ Ecology Clean Water Act Section Individual 401 permit, WA State Dept. of Ecology <br />(assumed based on channel change) <br />Scope of Service_Teanaway Hyd Imp_Amend 01_2018-04-19 <br />Page 3 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.