My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutionAuthorizingChairSignatureJacobsTO3Amendment1
>
Meetings
>
2018
>
05. May
>
2018-05-01 10:00 AM - Commissioners' Agenda
>
ResolutionAuthorizingChairSignatureJacobsTO3Amendment1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2018 12:17:08 PM
Creation date
5/14/2018 12:16:47 PM
Metadata
Fields
Template:
Meeting
Date
5/1/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
k
Item
Request to Approve a Resolution to Authorize the Chair's Signature on Jacobs Task Order No. 3 Amendment No. 1 Adding Additional Civil Engineering Services for the Teanaway Hydraulic Improvements Project
Order
11
Placement
Consent Agenda
Row ID
44352
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
With the new direction described herein the CONSULTANT will be responsible for delivering the final <br />plans, specifications, and estimate (opinion of cost) (PS&E) package. COUNTY will be responsible for <br />assembling the final PS&E with the other necessary COUNTY documents and for advertising the project. <br />SCOPE OF WORK <br />TASK 1 PROJECT MANAGEMENT <br />No changes to the original scope of work. An increased level of effort is required, associated <br />with the addition of final design tasks. This increase effort is shown in the budget. <br />TASK 2 DATA ANALYSIS <br />No changes to the original scope of work. <br />TASK 3 GEOTECHNICAL FIELD INVESTIGATION & LABORATORY ANALYSIS <br />No changes to the original scope of work. <br />TASK 4 GEOTECHNICAL ENGINEERING ANALYSIS & REPORT <br />No changes to the original scope of work. <br />TASK 5 NEPA/SEPA DOCUMENTATION <br />The original scope of work shown in this task requires an increased level of effort due to <br />direction from the COUNTY to change the proposed alignment of Lick Creek. The new or <br />deleted scope is shown below: <br />• Added Scope: <br />• NHPA Section 106 Evaluation <br />Increased coordination with the Cultural Resources Staff at the Yakama Nation due to <br />the additional area of potential effects and the amount of excavation for the new <br />channel. Coordination efforts will be done with Kittitas County and FHWA input and <br />approval. <br />• Wetland and Aquatic Resources Assessment and Report <br />♦ Delineate additional wetlands and aquatic resources within the area of the proposed <br />channel relocation. <br />• Endangered Species Act (ESA) Biological Assessment <br />♦ Additional effort for project effects associated with the new channel. <br />Provide enhanced ESA coordination with agencies throughout the review/approval <br />process <br />• NEPA/SEPA <br />Coordinate with FHWA regarding the NEPA process rather than WSDOT. <br />Support County Transportation Planner who will complete and internally coordinate <br />the NEPA Categorical Exclusion, SEPA Checklist, Local Agency Exemptions, and/or DNS. <br />Scope of Service_Teanaway Hyd Imp_Amend 01_2018-04-19 <br />Page 2 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.