My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutionAuthorizingChairSignatureJacobsTO3Amendment1
>
Meetings
>
2018
>
05. May
>
2018-05-01 10:00 AM - Commissioners' Agenda
>
ResolutionAuthorizingChairSignatureJacobsTO3Amendment1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2018 12:17:08 PM
Creation date
5/14/2018 12:16:47 PM
Metadata
Fields
Template:
Meeting
Date
5/1/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
k
Item
Request to Approve a Resolution to Authorize the Chair's Signature on Jacobs Task Order No. 3 Amendment No. 1 Adding Additional Civil Engineering Services for the Teanaway Hydraulic Improvements Project
Order
11
Placement
Consent Agenda
Row ID
44352
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 7 HYDRAULICS <br />The original scope of work shown in this task requires an increased level of effort. The original <br />scope for the Story Creek site was to provide a supporting role to COUNTY staff that had <br />intended on delivering the hydraulic design and report(s). The new scope directed by the <br />COUNTY is that the CONSULTANT shall provide the hydraulic analysis and report(s) for the Story <br />Creek site. <br />The original scope for the lick Creek site was to provide hydraulic analysis and design for a <br />short length (approx. 300 feet) of new creek channel from the west side of Teanaway Road to <br />the east side and reconnect to the existing channel on the east side of the road. The new scope <br />directed by the COUNTY is to realign the entire Lick Creek channel away from the existing <br />channel on the east side of the road, and take the new creek channel easterly across the DNR <br />property (approx. 2000 feet) to a new discharge point into the Teanaway River. The new or <br />deleted scope is shown below: <br />TASK 7.1— Story Creek <br />• Added Scope: <br />• Hydraulics <br />Perform hydraulic modeling to ascertain the hydraulic characteristics necessary to <br />support the design of the new culvert crossing and potential scour countermeasures for <br />the protection of the roadway prism. The hydraulic model will be developed using <br />topographic data collected by the County's selected surveyor. <br />• Bank Stability Assessment and Design <br />Examine stability of the existing scour protection and creek banks utilizing various <br />design manuals such as, Integrated Streambank Protection Guidelines (ISPG), HEC -18, <br />HEC -23, etc. <br />Identify proposed measures that are acceptable from a channel stability and habitat <br />perspective. <br />• Scour Analysis <br />Compute depth of scour estimates for the proposed culvert crossing and for any <br />necessary scour countermeasures. <br />• Team Meetings & Permitting Assistance <br />♦ Key project elements and findings will be discussed with the services and select <br />stakeholders as determined by CONSULTANT and COUNTY staff. Likely participants will <br />include the USACE, WDFW, and potential property owners. <br />• Documentation <br />The results of the hydraulic and scour assessment will be summarized in two separate <br />documents, specifically, a Preliminary Basis of Design and a Final Basis of Design <br />Report. The report will include a description of the physical characteristics of the site, <br />Scope of Service—Teanaway Hyd Imp_Amend 01_2018-04-19 <br />Page 4 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.